MaintainX Asset Hub logo
EnterprisePricing
Cleveland

Cleveland Gas Mixing Kettle Horizontal Agitator HA-MKGL-100

Need answers fast?
Explore the manual using AI.

Cleveland Gas Mixing Kettle Horizontal Agitator HA-MKGL-100
Cleveland Gas Mixing Kettle Horizontal Agitator HA-MKGL-100

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Cleveland Gas Mixing Kettle Horizontal Agitator HA-MKGL-100

Cleveland Gas Mixing Kettle Horizontal Agitator HA-MKGL-100

Create an account to install this asset package.

Maintenance Plans for Cleveland Gas Mixing Kettle Horizontal Agitator Model HA-MKGL-100

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Flush Piston Valve Cleaning

Check mark

FLUSH PISTON VALVE

Check mark

(Used prior to 2003.)

Check mark

Daily - clean valve as follows:

Check mark

Air regulator

Check mark

Controls air flow to automatic dump valve, turn clockwise to open and counterclockwise to close (extend plunger)

Check mark

Air quick connect

Check mark

Push yellow tab down to release air pressure before disconnecting air hose

Check mark

To remove valve from kettle:

Check mark

1. Place valve in open position.

Run this procedureArrow right

1 Daily Kettle Cleaning

Check mark

CAUTION SURFACES MAY BE EXTREMELY HOT!

Check mark

CARE AND CLEANING

Check mark

Cooking equipment must be cleaned regularty to maintain its fast, efficient cooking performance and to ensure its continued safe, reliable operation. The best time to clean is shortly after each use (allow unit to cool to a sate temperature).

Check mark

WARNINGS

Check mark

Do not use detergents or cleansers that are chloride based or contain quaternary salt.

Check mark

Do not use a metal bristle brush or scraper.

Check mark

Steel wool should never be used for cleaning the stainless steel.

Check mark

Unit should never be cleaned with a high pressure spray hose.

Check mark

Do not leave water sitting in unit when not in use.

Run this procedureArrow right

1 Daily Seal Retainer Plate Cleaning

Check mark

SEAL RETAINER PLATE (Replaces QUAD RING after June 1999.)

Check mark

Apply food safe grease to grease nipples until you see clean grease inside the kettle

Check mark

Grease daily

Check mark

Sign off on the daily seal retainer plate cleaning

Run this procedureArrow right

1 Monthly Kettle Maintenance

Check mark

MONTHLY INSPECTION

Check mark

• Inspect all switches for damage. Replace rubber boots or switches as required.

Check mark

• Check that the automatic dump valve works fully and smoothly and no air leaks are evident.

Check mark

• Check that the 3 way regulator shuts off the incoming air and completely vacates the air from the air hose to the metering filling station.

Check mark

• Tilt kettle and check for smooth operation in both directions.

Check mark

• Inspect gear and worm assembly in gear box for play - tighten Allen screws if required.

Check mark

• Inspect gasket material on covers for integrity.

Check mark

• Check spring assist covers for tightness to handle and insure spring is holding cover up - adjust if required. Refer to HINGE ADJUSTMENT INSTRUCTIONS.

Check mark

HINGE ADJUSTMENT INSTRUCTIONS

Run this procedureArrow right

1 Monthly Kettle Venting

Check mark

When kettle is cold check that pressure gauge needle is in the green zone indicating a vacuum in kettle - if venting is required refer to KETTLE VENTING PROCEDURE.

Check mark

KETTLE VENTING INSTRUCTIONS

Check mark

The following venting procedure should be followed when the Vacuum/Pressure Gauge needle is in the "VENT AIR" zone:

Check mark

NOTE: Check for and eliminate leaks prior to venting (See REPAIRING LEAKS IN STEAM JACKETED KETTLE FITTINGS).

Check mark

DANGER: PRESSURE RELIEF VALVE WILL EXHAUST HIGH TEMPERATURE STEAM. CONTACT WITH SKIN COULD RESULT IN SERIOUS BURNS. KEEP FACE, HANDS AND BODY CLEAR OF DISCHARGE.

Check mark

DANGER: WORKING ON MACHINES WITH POWER COULD RESULT IN SEVERE ELECTRICAL SHOCK.

Check mark

1. Remove Access Panel from back of main kettle console.

Check mark

2. Turn kettle ON and set temperature control to 10, heat the empty kettle until unit cycles off.

Check mark

3. Vent kettle by pulling Valve Ring eight to fifteen times, holding valve open for two seconds each time.

Run this procedureArrow right

Parts for Cleveland Gas Mixing Kettle Horizontal Agitator HA-MKGL-100

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Air Operated Cylinder

KE55253

Buna-N O-Ring

KE55255

Buna-N O-Ring

KE55248

Capacitor Assembly

KE02274

Contactor Cartridge, Normally closed

KE603208-8

Air Operated Cylinder

KE55253

Buna-N O-Ring

KE55255

Buna-N O-Ring

KE55248

Capacitor Assembly

KE02274

Contactor Cartridge, Normally closed

KE603208-8

Air Operated Cylinder

KE55253

Buna-N O-Ring

KE55255

Buna-N O-Ring

KE55248

Capacitor Assembly

KE02274

Contactor Cartridge, Normally closed

KE603208-8

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Cleveland

Explore Other Assets