MaintainX Logo
EnterprisePricing
Budgit

Budgit Air Chain Hoist 600 lbs

Need answers fast?
Explore the manual using AI.

Budgit Air Chain Hoist 600 lbs
Budgit Air Chain Hoist 600 lbs

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Budgit Air Chain Hoist 600 lbs

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Budgit Air Chain Hoist 600 lbs

Budgit Air Chain Hoist 600 lbs

Create an account to install this asset package.

Maintenance Plans for Budgit Air Chain Hoist Model 600 lbs

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Hoist Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Operate the hoist, with no load, and check for visual signs or abnormal noises which could indicate a potential problem

Check mark

Brake for evidence of slippage

Check mark

Chain for lubricant, wear, damaged links or foreign material

Check mark

Hooks for damage, cracks, twist, latch engagement and latch operation

Check mark

Any deficiencies found during the inspection

Check mark

Sign off on the hoist maintenance

Run this procedureArrow right

1 Yearly Hoist Maintenance

Check mark

Air Motor

Check mark

Once a year, remove the air motor and check the condition of the bearings, rotor for possible rubbing on the body or end plates, free movement of the blades in rotor slots, seals and shims.; Replace worn or damaged parts.; If the motor appears to be in good condition, do not service other than lubricating well with light machine oil.

Check mark

Pendant Throttle Control

Check mark

Once a year, disassemble the pendant throttle control and check the condition of the springs, valves and levers.; Replace worn or damaged parts.; If the parts appear to be in good condition, do not service other than lubricating well with light machine oil.

Check mark

Control Valve Assembly

Check mark

Once a year, disassemble the control valve assembly and check the condition of the pistons, springs, spring seats, gasket, O-rings, valve bolts, air fittings and muffler.; Replace worn or damaged parts.; If the parts appear to be in good condition, do not service other than lubricating them with light machine oil.;

Run this procedureArrow right

6 Monthly Hoist Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

External evidence of loose screws.

Check mark

External evidence of worn, corroded, cracked or distorted hook block, gears, bearings, chain stop and hook retainer.

Check mark

External evidence of damage or excessive wear of the liftwheel or sheave (double reeved unit).

Check mark

Check chain guide for wear or burring where the chain enters the hoist.

Check mark

External evidence of excessive wear of brake parts.

Check mark

Check the control station levers to make sure they operate freely and spring back when released.

Check mark

Check air supply hose and control hose for kinks, cuts, leaks and damage.

Check mark

Check the chain pin or dead end pin and chain stop for wear and cracks.

Run this procedureArrow right

Hook Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Hook free from chemical damage

Check mark

Hook free from deformations or cracks

Check mark

Measure the degree of twist from the plane of the unbent hook

Check mark

Hook opening within acceptable limits

Check mark

Other load-sustaining components of the hoist free from damage

Check mark

Latch type hooks not damaged or bent

Check mark

Latch operates properly with sufficient spring pressure

Check mark

Sign off on the hook maintenance

Run this procedureArrow right

1 Daily Chain Maintenance

Check mark

LOAD CHAIN

Check mark

Chain feeds smoothly into and away from the hoist or hook block

Check mark

If chain binds, jumps or is noisy, first clean and lubricate it

Check mark

Chain Inspection

Check mark

Chain cleaned with a non-caustic/non-acid type solvent

Check mark

Link by link inspection for nicks, gouges, twisted links, weld spatter, corrosion pits, sitriations, cracks in weld areas, wear and stretching

Check mark

Chain with any one of these defects replaced

Check mark

Slack the portion of the chain that normally passes over the lift wheel

Check mark

Measure and record the stock diameter at the point of maximum wear of the link

Run this procedureArrow right

Parts for Budgit Air Chain Hoist 600 lbs

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Main Frame

20367

Liftwheel Seal

20705

Protector Bearing

88636

Protector Assembly, 500# (Single Reeved) & 1000# Units

20645

Thrust Washer, Second Pinion

88640

Main Frame

20367

Liftwheel Seal

20705

Protector Bearing

88636

Protector Assembly, 500# (Single Reeved) & 1000# Units

20645

Thrust Washer, Second Pinion

88640

Main Frame

20367

Liftwheel Seal

20705

Protector Bearing

88636

Protector Assembly, 500# (Single Reeved) & 1000# Units

20645

Thrust Washer, Second Pinion

88640

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Budgit

Explore Other Assets