MaintainX, an Autodesk company
EnterprisePricing
Becker Pumps

Becker Pumps Rotary Vane Vacuum Pump U 5.301

Need answers fast?
Explore the manual using AI.

Becker Pumps Rotary Vane Vacuum Pump U 5.301
Becker Pumps Rotary Vane Vacuum Pump U 5.301

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Becker Pumps Rotary Vane Vacuum Pump U 5.301

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Becker Pumps Rotary Vane Vacuum Pump U 5.301

Becker Pumps Rotary Vane Vacuum Pump U 5.301

Create an account to install this asset package.

Maintenance Plans for Becker Pumps Rotary Vane Vacuum Pump Model U 5.301

Integrate maintenance plans directly into your work orders in MaintainX.

500 Hourly / 6 Monthly Rotary Vane Vacuum Pump Maintenance

Check mark

Safety Precautions

Check mark

Ensure all protective devices are intact and not manipulated

Check mark

Verify that all hot components and equipment are handled with caution

Check mark

Confirm use of suitable PPE

Check mark

Ensure maintenance area is clean and tidy to prevent tripping hazards

Check mark

Consult supervisor or manufacturer if there is any uncertainty

Check mark

Air Effluent Element (LEE) Maintenance

Check mark

Change the Air Effluent Element (LEE)

Check mark

Pump Fan Maintenance

Run this procedureArrow right

500 Hourly / 6 Monthly Oil Cooler Cleaning

Check mark

Safety Precautions

Check mark

Ensure all electrical sources are disconnected to prevent electric shock.

Check mark

Verify all protective devices are intact and not dismantled or manipulated.

Check mark

Check for hot components and equipment to avoid burns.

Check mark

Ensure no contamination or environmental damage from operating materials.

Check mark

Wear suitable personal protective equipment (PPE).

Check mark

Review safety instructions as per section 2.9.

Check mark

Preparation

Check mark

Use appropriate tools and handle with care.

Run this procedureArrow right

500 Hourly / 6 Monthly Oil and Oil Filter Change

Check mark

Safety Precautions

Check mark

Wear suitable PPE

Check mark

Use appropriate tools and handle with care

Check mark

Ensure the maintenance area is clean and tidy

Check mark

Consult supervisor or manufacturer if uncertain

Check mark

Initial Checks

Check mark

Check for potential hazards

Check mark

Oil and Oil Filter Change

Check mark

Perform first oil change / oil filter change after 500 operating hours

Run this procedureArrow right

Air Oil Separator Change

Check mark

Safety Precautions

Check mark

Acknowledge the following dangers and precautions

Check mark

Wear suitable PPE

Check mark

Use appropriate tools and handle with care

Check mark

Keep the maintenance area clean and tidy

Check mark

Consult supervisor or manufacturer if uncertain

Check mark

Preparation

Check mark

Ensure all prerequisites for maintenance operation have been met

Check mark

Removal of Old LEE

Run this procedureArrow right

6 Monthly Coupling Check

Check mark

Safety Precautions

Check mark

Use appropriate tools and handle with care.

Check mark

Use personal protective equipment to prevent injury from tools or components.

Check mark

Keep the maintenance area clean and tidy to avoid tripping hazards.

Check mark

Consult the supervisor or manufacturer if there is any uncertainty.

Check mark

Pre-Maintenance Checks

Check mark

Ensure that all prerequisites for maintenance operation have been met.

Check mark

Attach the hoist to the lifting lugs of the engine.

Check mark

Coupling and Component Inspection

Run this procedureArrow right

Parts for Becker Pumps Rotary Vane Vacuum Pump U 5.301

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Pump Oil, Becker Lube M 100, Mineral Oil, General, 1 l

96000900001

Pump Oil, Becker Lube M 100, Mineral Oil, General, 5 l

96000900201

Pump Oil, Becker Lube S 100, Synthetic Oil, General, 1 l

96001600101

Pump Oil, Becker Lube S 100, Synthetic Oil, General, 5 l

96001600201

Pump Oil, Becker Lube SL 100, H1 Pump Oil, Food Processing, 1 l

96002300101

Pump Oil, Becker Lube M 100, Mineral Oil, General, 1 l

96000900001

Pump Oil, Becker Lube M 100, Mineral Oil, General, 5 l

96000900201

Pump Oil, Becker Lube S 100, Synthetic Oil, General, 1 l

96001600101

Pump Oil, Becker Lube S 100, Synthetic Oil, General, 5 l

96001600201

Pump Oil, Becker Lube SL 100, H1 Pump Oil, Food Processing, 1 l

96002300101

Pump Oil, Becker Lube M 100, Mineral Oil, General, 1 l

96000900001

Pump Oil, Becker Lube M 100, Mineral Oil, General, 5 l

96000900201

Pump Oil, Becker Lube S 100, Synthetic Oil, General, 1 l

96001600101

Pump Oil, Becker Lube S 100, Synthetic Oil, General, 5 l

96001600201

Pump Oil, Becker Lube SL 100, H1 Pump Oil, Food Processing, 1 l

96002300101

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Becker Pumps

Explore Other Assets