

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Antunes Egg Station ES-1200 9300532
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Cycle Times Check
Preparation
Turn the unit on and allow it to warm up for 30 minutes
Time 1 Button Check
Is the TIME 1 button lit?
Press and release the TIME 1 button if it is not lit
Ensure the TIME 1 button is now lit
Cycle Timing with Stopwatch
Press and release the Start/Stop button and start the stopwatch
Record the time when the Bacon Indicator Light begins to flash
1 Daily Station Cleaning
Safety Precautions
Turn the power off and unplug the power cord.
Allow the unit to cool down before performing any service or maintenance.
Cleaning Guidelines
Recommended cleaning tips for stainless steel equipment
Ensure chemical cleaner is safe for cast aluminum if used.
Daily Cleaning Procedure
Turn the unit off, unplug the power cord, and allow the unit to cool down before proceeding.
Scrape the Platen surface clean of any residue.
1 Yearly Egg Rings Replacement
Inspection and Cleaning
Inspect the Egg Rings for damage
Clean the Egg Rings
Flip the Egg Rings 180° if required
Installation and Adjustment
Ensure Egg Rings move freely up and down within the Egg Rack
Reshape Egg Ring to its normal form if it does not move freely
Reinstall the Egg Ring
Final Check
Grill Platen Temperature Check
WARNING: Hot Surfaces
NOTE: Pyrometer Required
Remove the cover and the Egg Rack
Turn the power on and allow 30 minutes for the unit to warm up
Measure the temperature at the middle of the Platen surface
Is the temperature within the range of 250°F–300°F (121°C–149°C)?
Call your Authorized Service Agency if temperature is out of range
Turn the power off
Reinstall cover and Egg Rack and Top Cover
Access the parts list for your equipment in MaintainX.
Nose Piece Weldment
21327
Bumper, Recess Leg 1" (Set Of 4 Including 4 Screws)
210K230
Grill Platen
7000379
Lock-Nut, Conduit - 1/2" NPT
040P138*
Strain Relief Kit
040K251
Nose Piece Weldment
21327
Bumper, Recess Leg 1" (Set Of 4 Including 4 Screws)
210K230
Grill Platen
7000379
Lock-Nut, Conduit - 1/2" NPT
040P138*
Strain Relief Kit
040K251
Nose Piece Weldment
21327
Bumper, Recess Leg 1" (Set Of 4 Including 4 Screws)
210K230
Grill Platen
7000379
Lock-Nut, Conduit - 1/2" NPT
040P138*
Strain Relief Kit
040K251
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













