Alfa Laval Rotary Lobe Displacement Pump GHPD-422
Alfa Laval Rotary Lobe Displacement Pump GHPD-422

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Alfa Laval Rotary Lobe Displacement Pump GHPD-422

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Alfa Laval Rotary Lobe Displacement Pump GHPD-422

Alfa Laval Rotary Lobe Displacement Pump GHPD-422

Create an account to install this asset package.

Maintenance Plans for Alfa Laval Rotary Lobe Displacement Pump Model GHPD-422

Integrate maintenance plans directly into your work orders in MaintainX.

Packed Gland with Flush Adjustment

Check mark

CAUTION! DRIP LEAKAGE IS ESSENTIAL TO PREVENT OVER HEATING OF THE GLAND AREA WHICH WILL CAUSE SEAL FAILURE.

Check mark

IMPORTANT! Stop and remove gland guard for checking temperature of housing and observing leakage. ALWAYS REPLACE THE GUARD BEFORE RESTARTING.

Check mark

1. Lightly tighten up the gland follower.

Check mark

2. Flood the pumphead and determine if the gland leakage is acceptable. Tighten the gland follower nuts until an acceptable leakage is achieved.

Check mark

3. Start the pump and allow to run for 10 minutes. If the gland becomes significantly hotter than other parts of the pump, the gland is too tight.

Check mark

4. Stop the pump and allow it to cool then repeat the above until the gland temperature is stable and gland slightly weeping.

Check mark

5. Run the pump at 10 minute intervals tightening the gland follower nuts by a ½ of a turn until the leak is at an acceptable rate.;

Run this procedureArrow right

Packed Gland Replacement

Check mark

– The packing rings are located within the gland housing and are tightened onto the shaft sleeve by adjusting the gland follower. On flushed packed glands a lantern ring replaces the middle ring of packing. The shaft sleeve is retained to the shaft by three socket set screws and is sealed by an 'O' ring.

Check mark

REMOVING THE PACKED GLAND

Check mark

1. Release and pull back the gland follower.

Check mark

2. Remove the rotorcase with gland housing, packing and gland follower still assembled.

Check mark

3. Loosen the shaft sleeve socket set screws and extract the sleeve from the shaft.

Check mark

4. Inspect and replace the packing and shaft sleeve if necessary.

Check mark

FITTING THE PACKED GLAND

Check mark

1. Lubricate the 'O'ring, locate in shaft sleeve and slide onto the shaft.

Check mark

2. Tighten up the socket set screws.

Run this procedureArrow right

Pump Cleaning

Check mark

• The pump can be manually cleaned or cleaned in place (C.I.P.). The following is an example of a typical CIP procedure. However specific advice for each application should be sought from the pump supplier.

Check mark

1. Flush through the system with cold water (42°F).

Check mark

2. Run hot caustic soda (158-176°C) at 2.5% dilution through the system for 20-30 minutes.

Check mark

3. Final flush through with cold water again.

Check mark

NEVER touch the pump or pipes as they will be extremely HOT!

Check mark

DO NOT subject the pump to rapid temperature changes during C.I.P. procedures, as pump seizure can result from thermal shock. A suitable by-pass is recommended.

Check mark

ALWAYS use rubber gloves and protective when handling caustic agents.

Check mark

ALWAYS rinse will with clean water using a cleaning agent.

Check mark

ALWAYS store/discharge cleaning agents in accordance with current rules d/directives.;

Run this procedureArrow right

Initial 150 Hours Lubrication Oil Replacement

Check mark

Warning: The pump will NOT be supplied oil filled.

Check mark

First change - After 150 hours of operation.

Check mark

Only use the oil/grease types recommended by your supplier.

Check mark

Did you fill with oil through the filler plug to the level indicated in the sight glass?

Check mark

Sign off on the oil replacement

Run this procedureArrow right

3000 Hourly Lubrication Oil Replacement

Check mark

Warning: The pump will NOT be supplied oil filled.

Check mark

Enter the current hours of operation

Check mark

Has the pump been operated for 150 hours?

Check mark

If yes, proceed to oil replacement. If no, wait until 150 hours of operation.

Check mark

Did you fill the oil through the filler plug to the level indicated in the sight glass?

Check mark

Sign off on the oil replacement

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Alfa Laval

Explore Other Assets