Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Airedale International Air Conditioning Free-Cooling Chiller UCFC200D-6/2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Chiller Maintenance
Safety Precautions
Ensure all work is carried out by technically trained competent personnel.
Isolate equipment to ensure no live electrical or moving parts are active before maintenance or repair work.
Visual Inspection
Visually inspect the unit for general wear and tear.
Treat metalwork for any signs of wear and tear.
Visually inspect pipe and pipework insulation.
Cleaning Tasks
Clean evaporator water strainer.
12 Monthly Chiller Maintenance
CAUTION!
6 Month Checks
Repeat 6 month checks
12 Month Additional Checks
Check safety devices cut out the compressor at the correct settings.
Tighten all electrical terminals.
6 Monthly Chiller Maintenance
Safety Precautions
Ensure all work is carried out by technically trained competent personnel.
Isolate equipment to ensure no live electrical or moving parts are active before maintenance.
3 Month Checks
Repeat 3 month checks
6 Month Specific Checks
Check evaporator trace heating activation temperature
Check low ambient thermostat activation temperature
Post Maintenance
3 Monthly Chiller System Check
CAUTION!
Pre-Inspection Safety Measures
Ensure the system is isolated from electrical supply
Commissioning Records Verification
Verify the following against commissioning records
Operational Checks
Ensure chilled water pump operates efficiently
Ensure flow switch operates efficiently
Verify interlocks function correctly
7500 Hourly / 4 Yearly Compressor Oil Inspection
Safety Precautions
Ensure all work is carried out by technically trained competent personnel
Isolate equipment to prevent electrical and mechanical hazards
Compressor Oil Inspection
Record the current operating hours of the compressor
Has the compressor reached 7,500 hours or 4 years of operation?
Inspect the condition of the compressor oil
Is the compressor oil in acceptable condition?
Describe any issues found with the compressor oil
Access the parts list for your equipment in MaintainX.
Water Flange Connections: UCFC160-250
DN80 PN16
Water Flange Connections: UCFC160-250
DN80 PN16
Water Flange Connections: UCFC160-250
DN80 PN16
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













