Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Airedale International Air Conditioning Free-Cooling Chiller UCFC160D-6/2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Chiller System Check
CAUTION!
Pre-Inspection Safety Measures
Ensure all electrical and moving parts are isolated before starting maintenance.
Commissioning Records Verification
Verify the following against the commissioning records
Operational Checks
Ensure chilled water pump and flow switch operate efficiently.
Verify that interlocks function correctly.
Check operation of waterflow switch and pump interlock.
3 Monthly Chiller Maintenance
Safety Precautions
Ensure all work is carried out by technically trained competent personnel.
Isolate equipment to ensure no live electrical or moving parts are active before maintenance or repair work.
Visual Inspection
Visually inspect the unit for general wear and tear.
Treat metalwork for any signs of rust.
Visually inspect pipe and pipework insulation.
Cleaning Tasks
Clean evaporator water strainer.
12 Monthly Refrigeration System Maintenance
CAUTION!
Pre-Maintenance Safety Check
Ensure all electrical and moving parts are isolated before starting maintenance.
System Checks
Check glycol concentration if appropriate.
Leak test all R407C joints and inspect all water connections.
Check superheats with chiller running on full load.
Is the chiller running on full load?
Post-Adjustment Verification
3 Monthly Refrigeration System Check
CAUTION!
Pre-Inspection Safety
Ensure the system is isolated from electrical supply
System Checks
Record suction reading
Record discharge reading
Is head pressure control maintained?
Check pressure relief indicator gauge
Check each circuit sight glass for dryness and bubbles
7500 Hourly / 4 Yearly Compressor Oil Inspection
Safety Precautions
Ensure all work is carried out by technically trained competent personnel
Isolate equipment to prevent electrical and mechanical hazards
Compressor Oil Inspection
Record the current operating hours of the compressor
Has the compressor reached 7,500 hours or 4 years of operation?
Inspect the condition of the compressor oil
Is the compressor oil in acceptable condition?
Describe any issues found with the compressor oil
Access the parts list for your equipment in MaintainX.
Water Flange Connections: UCFC160-250
DN80 PN16
Water Flange Connections: UCFC160-250
DN80 PN16
Water Flange Connections: UCFC160-250
DN80 PN16
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX