

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

ABB Water Drive ACQ580-01-02A7-4
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Capacitors Check
Warning: This procedure requires trained personnel with PPE!
Capacitors: The intermediate DC circuit of the drive contains several electrolytic capacitors. Operating time, load, and surrounding air temperature have an effect on the life of the capacitors. Capacitor life can be extended by decreasing the surrounding air temperature. Capacitor failure is usually followed by damage to the unit and an input cable fuse failure, or a fault trip. If you think that any capacitors in the drive have failed, contact ABB.
Has the drive been powered in the last year?
If the drive has not been powered for a year or more, the capacitors must be reformed.
Enter the surrounding air temperature
Check capacitor reforming for spare modules and spare capacitors
Report any signs of capacitor failure
Sign off on the capacitor check
1 Yearly Drive Inspection
Check quality of supply voltage
Inspect spare parts
Inspect tightness of terminals
Inspect dustiness, corrosion or temperature
Inspect IP66 (UL Type 4X) frames R1..R3: Drive cover and gasket assembly
1 Yearly Heatsink Cleaning
Electrical safety in installation, start-up and maintenance
Electrical safety precautions
WARNING! Obey these instructions. If you ignore them, injury or death, or damage to the equipment can occur.
If you are not a qualified electrical professional, do not do installation or maintenance work.
Do these steps before you begin any installation or maintenance work.
Clearly identify the work location and equipment.
Disconnect all possible voltage sources. Make sure that re-connection is not possible. Lock out and tag out.
Protect any other energized parts in the work location against contact.
Take special precautions when close to bare conductors.
20 Yearly Functional Safety Components Replacement
Warning: This procedure requires trained personnel with PPE!
The mission time of functional safety components is 20 years.
The expiry of mission time terminates the certification and SIL/PL classification of the safety function.
Choose the renewal option
Note: Renewal of components is economical only with larger drives that have replaceable circuit boards and other components such as relays.
The remaining mission time of the whole circuit is however determined by its oldest component.
Enter the age of the oldest component in the circuit
Did the safety function pass the post-renewal test?
Issues found during the test
3 Yearly R1- R2 Auxiliary Cooling Fan Replacement
Warning: This procedure requires a qualified electrical professional. Do not attempt if you are not qualified.
Before starting, ensure all possible voltage sources are disconnected and the work location is clearly identified.
Voltage sources disconnected and work location identified?
Wait for 5 minutes to let the intermediate circuit capacitors discharge before you continue.
Waited for 5 minutes?
Measure that the installation is de-energized using a quality voltage tester.
Installation de-energized?
Install temporary grounding as required by the local regulations.
Temporary grounding installed?
Access the parts list for your equipment in MaintainX.
Circuit Breaker, ABB Type
S 203P-B/C/Z 10
Du/Dt Filter, ABB Drives
NOCH0016-6x
Fuse, ABB Type
OFAF000H4
Fuse, Bussmann Type, DIN 43620 Blade Style
170M1561
Fuse, Bussmann Type, DIN 43653 Bolted Tags
170M1311
Circuit Breaker, ABB Type
S 203P-B/C/Z 10
Du/Dt Filter, ABB Drives
NOCH0016-6x
Fuse, ABB Type
OFAF000H4
Fuse, Bussmann Type, DIN 43620 Blade Style
170M1561
Fuse, Bussmann Type, DIN 43653 Bolted Tags
170M1311
Circuit Breaker, ABB Type
S 203P-B/C/Z 10
Du/Dt Filter, ABB Drives
NOCH0016-6x
Fuse, ABB Type
OFAF000H4
Fuse, Bussmann Type, DIN 43620 Blade Style
170M1561
Fuse, Bussmann Type, DIN 43653 Bolted Tags
170M1311
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













