Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

ABB Air Circuit Breaker E6.2 5000 A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Yearly Interlock Cable Replacement
Interlock check
Check that the interlocking devices are installed and operate correctly
Ensure interlocks are not tested in the Test or Disconnected positions
Document the maintenance frequency based on the table guidelines
Was the cable replacement performed after a trip due to a short-circuit?
Advise replacement of cables as part of maintenance operations
1 Yearly Interlock Functionality Maintenance
Interlock check
Check that the interlocking devices are installed and operate correctly
Ensure interlocks are not tested in the Test or Disconnected positions
Describe any issues found during the interlock check
Maintenance Activity: Functionality
Perform maintenance as indicated in the table below
Check tightness of components
Refer to the kit sheet for detailed maintenance operations
Maintenance Activity: Lubrication
Circuit-Breaker Final Check
Final check list
Circuit-breaker OFF: Open the circuit-breaker
Circuit-breaker connected: Switch the circuit-breaker in withdrawable version to the connected position and reposition the crank in its seat
Trip unit Parameters: Adjust the protection trip unit in accordance with the design specifications of the installation
Removal of the Ekip TT: If present, remove the Ekip TT unit
Connecting the voltage: Connect the auxiliary voltage
Closing the switchgear: Close the switchgear door
Charging the springs: Charge the closing springs
Undervoltage coil: Make sure that undervoltage coil is energized
Circuit-Breaker General Check
Putting into service — Introduction
Acknowledge the necessity of the general check when the circuit-breaker is put into service for the first time or after prolonged inactivity
WARNING — RISK OF ELECTRIC SHOCK! Ensure all switchgear apparatus is de-energized before testing the circuit-breaker
Verify that only skilled persons in the electrical field perform the verifications
General checks
Switchgear
Connections
Perform opening and closing operations
Verify spring loading lever moves regularly
3 Yearly Circuit-Breaker Maintenance
Maintenance Schedule
Frequency in standard environments
Frequency in dusty environments (dust level > 1mg/m3)
Preliminary Operations
Set the circuit-breaker to the open position and discharge the springs of the operating mechanism
Is the circuit-breaker withdrawable?
Disconnect power supply to power circuit and auxiliary circuits for fixed circuit-breakers
Visibly ground the terminals on both the supply side and load side
Inspections and General Cleaning
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX