

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Zhejiang Ligao Pump Technology Metering Pump JLM1202
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Metering Pump Calibration
Pre-calibration Setup
Ensure all components are in place
Place the foot valve in a graduated container with a volume of 1000ml or more
Start the pump to exhaust air from the suction line and head
Stop the pump and refill the graduated container to a starting level
Calibration Process
Record the time the pump is turned on for (minimum 120 strokes)
Enter the volume of the discharge medium
Calculate and enter the flow rate
1 Yearly Check Valves Replacement
Safety Precautions
Ensure electrical maintenance is carried out by qualified electricians.
Unplug the power plug or disconnect the power.
Cut off power if there is a relay.
Ensure the pump's power supply is not turned on during maintenance.
Ensure the drainage pipe is decompressed before maintenance.
Discharge and wash the pump head cavity.
Confirm no use of corrosive liquid.
Check performance parameters of the metered liquid if it is hazardous or unknown.
Metering Pump Maintenance
Safety Precautions
Ensure electrical maintenance is carried out by qualified electricians
Unplug the power plug or disconnect the power before servicing
Ensure the pump's power supply is not turned on during maintenance
Decompress the drainage pipe before maintenance
Discharge and wash the pump head cavity
Prohibit the use of corrosive liquid
Hazardous Liquid Handling
Is the metered medium a hazardous or unknown liquid?
1 Yearly Diaphragm Replacement
Safety Precautions
Ensure electrical maintenance is carried out by qualified electricians.
Unplug the power plug or disconnect the power before servicing.
Ensure the pump's power supply is not turned on during maintenance.
Decompress the drainage pipe before maintenance.
Discharge and wash the pump head cavity.
Ensure no corrosive liquid is used.
Wear protective gear
Preparation
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













