MaintainX Asset Hub logo
EnterprisePricing
Novatec

Novatec Dryer NWB+-50

Need answers fast?
Explore the manual using AI.

Novatec Dryer NWB+-50
Novatec Dryer NWB+-50

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Novatec Dryer NWB+-50

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Novatec Dryer NWB+-50

Novatec Dryer NWB+-50

Create an account to install this asset package.

Maintenance Plans for Novatec Dryer Model NWB+-50

Integrate maintenance plans directly into your work orders in MaintainX.

Dryer Rotor Replacement

Check mark

Desiccant Rotor Removal

Check mark

Remove the hex nuts on the Top Plate Assy.

Check mark

Remove the washers & spring from the Tie Rod.

Check mark

Slide the Top Plate Assembly straight & upward gently.

Check mark

Loosen the Supporting Tie Rod from where rotor is to be moved.

Check mark

Remove the driven sprocket.

Check mark

Slide the Rotor straight & upward, ensuring it does not get damaged.

Check mark

Replace the desiccant rotor.

Check mark

Re-installation of Rotor

Run this procedureArrow right

2 Weekly Filter Maintenance

Check mark

Preparation

Check mark

Turn the main disconnect switch OFF

Check mark

Filter Access and Removal

Check mark

Turn the yellow knob to unlock the filter access cover

Check mark

Lift the filter access cover

Check mark

Remove the lock nut

Check mark

Pull cartridge filter out from housing

Check mark

Filter Cleaning or Replacement

Check mark

Choose the action for the filter

Run this procedureArrow right

Dryer Seal Replacement

Check mark

Seal Removal

Check mark

Remove rotor from the cassette

Check mark

Remove the old seal using a knife

Check mark

Remove silicon sealant

Check mark

Surface Preparation

Check mark

Clean the plate surface

Check mark

Seal Application

Check mark

Apply fresh silicon sealant

Check mark

Gently press the seal towards the plate, ensuring the seal’s section does not get offset

Run this procedureArrow right

Dryer Drive Motor Replacement

Check mark

Desiccant Rotor Removal

Check mark

Remove the chain from the drive sprocket

Check mark

Remove the drive sprocket from the motor shaft

Check mark

Remove the screws of the motor from the plate

Check mark

Replace the drive motor

Check mark

Re-installation of Drive Motor

Check mark

Re-install the drive motor by reversing the removal procedure

Run this procedureArrow right

2 Weekly Plasticizer Drainage

Check mark

Preparation

Check mark

Place a pan under the plasticizer drain

Check mark

Drainage Process

Check mark

Open the valve to drain the plasticizer

Check mark

Close the valve after draining

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Novatec

Explore Other Assets