

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Zhejiang Ligao Pump Technology Metering Pump JLM0110
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Check Valves Replacement
Safety Precautions
Ensure electrical maintenance is carried out by qualified electricians.
Unplug the power plug or disconnect the power before servicing.
Verify that the pump's power supply is not turned on during maintenance.
Depressurize the drainage pipe before maintenance.
Ensure no corrosive liquid is used during maintenance.
Check performance parameters of the metered liquid if it is hazardous or unknown.
Wear appropriate protective gear
Preparation
Metering Pump Calibration
Pre-calibration Setup
Ensure the pump is primed
Verify installation of components
Describe any factors affecting installation (e.g., working pressure, solution viscosity, suction lift)
Calibration Process
Place the foot valve in a graduated container with a volume of 1000ml or more
Start the pump to exhaust all air from the suction line and head
Stop the pump and refill the graduated container to a starting level
Record the time for which the pump is turned on (minimum 120 strokes)
1 Yearly Diaphragm Replacement
Safety Precautions
Ensure electrical maintenance is carried out by qualified electricians.
Unplug the power plug or disconnect the power.
Ensure the pump's power supply is not turned on during maintenance.
Decompress the drainage pipe before maintenance.
Discharge and wash the pump head cavity.
Ensure no corrosive liquid is used.
Wear protective gear
Preparation
Metering Pump Maintenance
Safety Precautions
Ensure electrical maintenance is carried out by qualified electricians
Unplug the power plug or disconnect the power before servicing
Cut off power if there is a relay
Ensure the pump's power supply is not turned on during maintenance
Preparation
Decompress the drainage pipe before maintenance
Discharge and wash the pump head cavity
Ensure no corrosive liquid is used
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













