MaintainX Asset Hub logo
EnterprisePricing
York

York Rooftop Unit DJ240N32C4BBC2A

Need answers fast?
Explore the manual using AI.

York Rooftop Unit DJ240N32C4BBC2A
York Rooftop Unit DJ240N32C4BBC2A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Rooftop Unit DJ240N32C4BBC2A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Rooftop Unit DJ240N32C4BBC2A

York Rooftop Unit DJ240N32C4BBC2A

Create an account to install this asset package.

Maintenance Plans for York Rooftop Unit Model DJ240N32C4BBC2A

Integrate maintenance plans directly into your work orders in MaintainX.

Burner Maintenance

Check mark

Burner Instructions

Check mark

Close main manual shut-off valve and shut off all electric power to the unit

Check mark

Remove the screws holding either end of the manifold to the burner supports

Check mark

Open the union fitting in the gas supply line just upstream of the unit gas valve and downstream from the main manual shut-off valve

Check mark

Remove the gas piping closure panel

Check mark

Disconnect wiring to the gas valves and spark ignitors

Check mark

Remove the manifold-burner gas valve assembly by lifting up and pulling back

Check mark

Ensure burners are accessible for service

Check mark

Reverse the procedure to replace the assemblies

Run this procedureArrow right

Manufold Gas pressure Adjustment

Check mark

Preparation

Check mark

Ensure the furnace is turned off

Check mark

Gather necessary tools for adjustment

Check mark

Adjustment Procedure

Check mark

Remove the cap on the regulator located next to the push-on electrical terminals

Check mark

Measure the current manifold gas pressure

Check mark

Adjust the gas pressure

Check mark

Measure the adjusted manifold gas pressure

Check mark

Is the manifold pressure within the correct range of 3.65 IWG ±0.3?

Run this procedureArrow right

Rooftop Unit Prestart Check

Check mark

Prestart Checklist - Cooling

Check mark

Check the electrical supply voltage being supplied

Check mark

Is the electrical supply voltage the same as listed on the unit nameplate?

Check mark

Set the room thermostat to the off position

Check mark

Turn unit electrical power on

Check mark

Set the room thermostat fan switch to on

Check mark

Is the indoor blower rotation correct?

Check mark

Check blower drive belt tension

Check mark

Check the unit supply air (CFM)

Run this procedureArrow right

Gas Input Check

Check mark

Preparation

Check mark

Turn off all other gas appliances connected to the gas meter

Check mark

Measurement

Check mark

Measure the time needed for one revolution of the hand on the smallest dial on the meter with the furnace turned on

Check mark

Enter the size of the test dial (1/2 or 1 cubic foot)

Check mark

Calculation

Check mark

Enter the number of seconds for one revolution

Check mark

Enter the furnace rating in Btuh

Check mark

Enter the Btu content of the gas in your locality

Run this procedureArrow right

Pilot Flame Check

Check mark

Pilot Checkout

Check mark

Ensure the pilot flame envelopes the end of the flame sensor

Check mark

Put the system into operation and observe through complete cycle to ensure all controls function properly

Check mark

Adjust Pilot Flame

Check mark

Remove pilot adjustment cover screw

Check mark

Adjust the clearance for air to the desired level

Check mark

Replace cover screw after adjustment to prevent possible gas leakage

Run this procedureArrow right

Parts for York Rooftop Unit DJ240N32C4BBC2A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Optional CO2 Space Sensor Kit

2AQ04700224

Optional CO2 Sensor Kit

2AQ04700124

Optional CO2 Space Sensor Kit

2AQ04700224

Optional CO2 Sensor Kit

2AQ04700124

Optional CO2 Space Sensor Kit

2AQ04700224

Optional CO2 Sensor Kit

2AQ04700124

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets