

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Rooftop Unit DJ210N32B4BBC2A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Rooftop Unit Prestart Check
Prestart Check List - Cooling
Check the electrical supply voltage being supplied
Is the electrical supply voltage the same as listed on the unit nameplate?
Set the room thermostat to the off position
Turn unit electrical power on
Set the room thermostat fan switch to on
Is the indoor blower rotation correct?
Is the blower drive belt tension correct?
Check the unit supply air (CFM)
Pilot Flame Check
Pilot Flame Adjustment
Remove pilot adjustment cover screw
Adjust the clearance for air to the desired level
Replace cover screw after adjustment to prevent possible gas leakage
System Operation Check
Put the system into operation
Observe through complete cycle to ensure all controls function properly
Burner Maintenance
Burner Instructions
Close main manual shut-off valve and shut off all electric power to the unit
Remove the screws holding either end of the manifold to the burner supports
Open the union fitting in the gas supply line just upstream of the unit gas valve and downstream from the main manual shut-off valve
Remove the gas piping closure panel
Disconnect wiring to the gas valves and spark ignitors
Remove the manifold-burner gas valve assembly by lifting up and pulling back
Ensure burners are accessible for service
Reverse the procedure to replace the assemblies
Temperature Rise Adjustment
Initial Temperature Measurements
Measure the return air temperature (6 feet from the furnace)
Measure the heated air temperature (6 feet from the furnace)
Calculate the temperature rise
Calculate the CFM
Blower Adjustment
Is the temperature rise within the range shown on the rating plate?
Adjust the blower CFM
Adjust the variable pitch pulley on the blower motor to obtain desired supply air CFM
Manufold Gas pressure Adjustment
Preparation
Ensure the furnace is turned off
Gather necessary tools for adjustment
Adjustment Procedure
Remove the cap on the regulator located next to the push-on electrical terminals
Measure the current manifold gas pressure
Adjust the gas pressure
Measure the adjusted manifold gas pressure
Is the manifold pressure within 3.65 IWG ±0.3?
Access the parts list for your equipment in MaintainX.
Optional CO2 Space Sensor Kit
2AQ04700224
Optional CO2 Sensor Kit
2AQ04700124
Optional CO2 Space Sensor Kit
2AQ04700224
Optional CO2 Sensor Kit
2AQ04700124
Optional CO2 Space Sensor Kit
2AQ04700224
Optional CO2 Sensor Kit
2AQ04700124
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













