Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Heat Exchanger 08060-SSCF-C
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heat Exchanger Maintenance
Maintenance
Ensure all pressure is off equipment and the unit is drained before opening heads.
Remove the bonnets.
Inspect all tubes for erosion, corrosion, or foreign material.
Inspect all anodes for excessive corrosion or scale insulation and scrape to a bright surface.
Inspect filters to prevent foreign matter from entering the exchanger.
Avoid blowing out heat exchangers with air when operating fluids are flammable or hazardous.
Select cleaning method for heat exchangers
Use a torque wrench when replacing heads and tighten bolts to specified torque values.
Heat Exchanger Storage Maintenance
Storage
Inspect for shipping damage and contamination
Is the heat exchanger placed in immediate service?
Take precautions to prevent rusting or contamination if not in immediate service
Describe preservation methods for interior surfaces during storage
Remove accumulations of dirt, water, ice or snow and wipe dry before indoor storage
Was the unit filled with oil or other preservative?
Open drain plugs to remove accumulated moisture, then reseal if not filled with preservative
Store under cover in a heated area, if possible
Initial Heat Exchanger Startup Check
Operation
Open the vent connections and start to circulate the cold medium only.
Are the passages in the exchanger entirely filled with the cold fluid before closing the vents?
Introduce the hot medium gradually until all passages are filled with liquid, then close vents.
Slowly bring the unit up to temperature.
Was the operation started gradually?
Ensure no hot fluid is admitted to the unit suddenly when empty or cold.
Ensure the unit is not shocked with cold fluid when hot.
Heat Exchanger Scale Inspection
Maintenance
Observe interior and exterior condition for scale build-up
Is there any noticeable scale build-up on the tubes?
Check for complete stoppage of flow through tubes due to scale
Has there been a marked increase in pressure drop?
Has there been a reduction in performance?
Has the unit been checked for air or vapor binding?
Clean the tubes if fouling or scaling is observed
Describe any observed damage to the heat exchanger due to scale build-up
Heat Exchanger Anode Inspection
Maintenance — Anodes
Verify the presence of components
Inspect anodes for scale or surface coatings
Are pipe plugs used instead of anodes?
Check pipe plug material
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX