MaintainX Asset Hub logo
EnterprisePricing
Xylem

Xylem Heat Exchanger 08036-BCF

Need answers fast?
Explore the manual using AI.

Xylem Heat Exchanger 08036-BCF
Xylem Heat Exchanger 08036-BCF

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Xylem Heat Exchanger 08036-BCF

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Xylem Heat Exchanger 08036-BCF

Xylem Heat Exchanger 08036-BCF

Create an account to install this asset package.

Maintenance Plans for Xylem Heat Exchanger Model 08036-BCF

Integrate maintenance plans directly into your work orders in MaintainX.

Heat Exchanger Scale Inspection

Check mark

Maintenance

Check mark

Observe interior and exterior condition for scale build-up

Check mark

Is there any noticeable scale build-up on the tubes?

Check mark

Check for complete stoppage of flow through tubes due to scale

Check mark

Has there been a marked increase in pressure drop?

Check mark

Has there been a reduction in performance?

Check mark

Has the unit been checked for air or vapor binding?

Check mark

Clean the tubes if fouling or scaling is observed

Check mark

Describe any observed damage to the heat exchanger due to scale build-up

Run this procedureArrow right

Heat Exchanger Shutdown Maintenance

Check mark

Operation — Shutdown

Check mark

Ensure all safety measures are in place before shutdown

Check mark

Shut off flow of hot medium first

Check mark

Is it necessary to stop circulation of cooling medium?

Check mark

Stop circulation of hot medium if cooling medium circulation is stopped

Check mark

Drain all fluids to prevent freezing and corrosion

Check mark

Drain condensate from steam heaters to prevent water hammer

Check mark

Ensure no pulsation of fluids to prevent vibration and strain

Run this procedureArrow right

Initial Heat Exchanger Startup Check

Check mark

Operation

Check mark

Open the vent connections and start to circulate the cold medium only.

Check mark

Are the passages in the exchanger entirely filled with the cold fluid before closing the vents?

Check mark

Introduce the hot medium gradually until all passages are filled with liquid, then close vents.

Check mark

Slowly bring the unit up to temperature.

Check mark

Was the operation started gradually?

Check mark

Was hot fluid admitted to the unit gradually and not suddenly when empty or cold?

Check mark

Was the unit shocked with cold fluid when hot?

Run this procedureArrow right

Heat Exchanger Storage Maintenance

Check mark

Storage

Check mark

Inspect for shipping damage and contamination

Check mark

Is the heat exchanger placed in immediate service?

Check mark

Take precautions to prevent rusting or contamination if not in immediate service

Check mark

Describe preservation methods for interior surfaces during storage

Check mark

Remove accumulations of dirt, water, ice or snow and wipe dry before indoor storage

Check mark

Was the unit filled with oil or other preservative?

Check mark

Open drain plugs to remove accumulated moisture if not filled with preservative

Check mark

Store under cover in a heated area, if possible

Run this procedureArrow right

Heat Exchanger Maintenance

Check mark

Maintenance

Check mark

Ensure all pressure is off equipment and the unit is drained before opening heads.

Check mark

Remove the bonnets.

Check mark

Inspect all tubes for erosion, corrosion, or foreign material.

Check mark

Inspect all anodes for excessive corrosion or scale insulation and scrape to a bright surface.

Check mark

Inspect filters to prevent foreign matter from entering the exchanger.

Check mark

Avoid blowing out heat exchangers with air if operating fluids are flammable or hazardous.

Check mark

Select cleaning method for heat exchangers

Check mark

Use a torque wrench when replacing heads and tighten bolts to specified torque values.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Xylem

Explore Other Assets