

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Centrifugal Pump VSC
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Centrifugal Pump Inspection
Pre-Inspection Preparation
Ensure the pump is turned off and isolated from the power source
Verify that the pump has cooled down to a safe temperature
Inspection of Pump Components
Check the condition of the following components
Record the vibration level of the pump
Record the noise level of the pump
Operational Checks
Is the pump operating within the specified pressure range?
Centrifugal Pump Bearings Lubrication
Pre-Lubrication Inspection
Ensure the pump has been stored in a clean, dry place prior to operation.
Have the bearings been watched for about an hour after pump start to ensure proper operation?
Bearing Housing Maintenance
Thoroughly clean out the bearing housing if the bearing brackets are removed for maintenance.
Ensure the bearing housing is protected against dust and contaminants.
Pump Reassembly
Reassemble the pump using new bearings and lip seals.
Use grease fittings to fill the bearing cavities.
Centrifugal Pump Packing Maintenance
Initial Setup
Ensure the pump is turned off and isolated from the power source.
Loosen the packing slightly to avoid air leaks.
Gland Bolt Adjustment
Gradually tighten the gland bolts evenly while the pump is running.
Ensure the gland is not over-tightened to prevent packing compression.
Stuffing Box Inspection
Check if the rotating element can be turned by hand to ensure proper packing adjustment.
Measure the drippage from the stuffing box (drops per minute).
Centrifugal Pump Maintenance
Safety Precautions
Disconnect and lockout power before servicing
Ensure electrical connections are made by a qualified electrician
Inspect and Replace Components
Replace bearings and grease if the pump has been in a flooded condition
Evaluate the motor by a qualified motor shop before putting it back into service
Clean and inspect mechanical seals, stuff boxes, and packing rings
Replace mechanical seals, stuff boxes, and packing rings if needed
Replace couplings that require lubrication
Access the parts list for your equipment in MaintainX.
Universal Fixture Kit
AC2394
Universal Fixture Kit
AC2394
Universal Fixture Kit
AC2394
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













