MaintainX Logo
EnterprisePricing
Wagner

Wagner Portable Powdercoat Unit EPG-Sprint X

Need answers fast?
Explore the manual using AI.

Wagner Portable Powdercoat Unit EPG-Sprint X
Wagner Portable Powdercoat Unit EPG-Sprint X

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Wagner Portable Powdercoat Unit EPG-Sprint X

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Wagner Portable Powdercoat Unit EPG-Sprint X

Wagner Portable Powdercoat Unit EPG-Sprint X

Create an account to install this asset package.

Maintenance Plans for Wagner Portable Powdercoat Unit Model EPG-Sprint X

Integrate maintenance plans directly into your work orders in MaintainX.

1 Weekly Portable Powdercoat Unit Inspection

Check mark

Inspect and test whether all parts carrying high-voltage do not result in discharge which puts people at risk

Check mark

Visual check of ground connections

Check mark

Perform function test on grounding switch

Check mark

Measurement of grounding resistors

Check mark

Measurement of discharge energy

Check mark

Measure resistance to ground (work piece receiver - ground potential) max. 1 megohm @ 1,000 V

Check mark

Check the monitoring equipment's test function by triggering it

Check mark

Sign off on the inspection

Run this procedureArrow right

1 Yearly Portable Powdercoat Unit Inspection

Check mark

1. Test whether the system is safely stopped and the product supply, supply air, and high-voltage are switched off when the ventilation is shut down.

Check mark

- The technical ventilation should be interlocked so that the powder feed and high-voltage cannot be switched on while the technical ventilation is not working effectively.

Check mark

2. Every 6 Months: Inspect trigger fire extinguishing system, observe manufacturer's requirements.

Check mark

- Effectiveness of the manually or automatically actuated fire extinguishing systems (room protection system).;

Run this procedureArrow right

Portable Powdercoat Unit Cleaning

Check mark

Warning: Cleaning work should be undertaken regularly and carefully by qualified and trained staff.

Check mark

Warning: Health hazard from inhaling powder lacquer.

Check mark

Warning: Use of unsuitable cleaning tools and aids can cause damage.

Check mark

Danger: Explosive powder/air mixes! Danger to life and damage to the device.

Check mark

High-voltage shut down and locked before starting cleaning?

Check mark

Spray gun separated from the high-voltage supply before cleaning?

Check mark

Used only electrically conductive tanks for cleaning liquids?

Check mark

Preference given to non-flammable cleaning fluids?

Check mark

Flammable cleaning liquids used only after discharging high-voltage conducting parts?

Run this procedureArrow right

1 Daily Portable Powdercat Unit Maintenance

Check mark

Warning: Maintenance work should be undertaken regularly and carefully by qualified and trained staff. They should be informed of specific hazards during their training.

Check mark

Health hazard from inhaling powder lacquer.

Check mark

Use of unsuitable tools and aids.

Check mark

Once the maintenance work is complete, the device must be checked by a qualified person to ensure a reliable condition.

Check mark

DANGER! Incorrect maintenance/repair! Danger to life and damage to the device.

Check mark

Repair or replacement of devices or parts of devices are only allowed to be performed outside the hazard area by qualified personnel.

Check mark

Incorrect maintenance/repair! Risk of injury and damage to the device.

Check mark

Have repairs and part replacements carried out only by specially trained staff or a WAGNER service center.

Check mark

Before all work on the device and in the event of work interruptions: Switch off the energy/compressed air supply. Relieve spray gun and device pressure. Secure the spray gun against actuation.

Run this procedureArrow right

1 Weekly Portable Powdercoat Unit Check

Check mark

Maintenance work should be undertaken regularly and carefully by qualified and trained staff . They should be informed of specific hazards during their training.

Check mark

The following hazards may arise during maintenance work: Health hazard from inhaling powder lacquer. Use of unsuitable tools and aids.

Check mark

Once the maintenance work is complete, the device must be checked by a qualified person to ensure a reliable condition.

Check mark

DANGER! Incorrect maintenance/repair! Danger to life and damage to the device. Repair or replacement of devices or parts of devices are only allowed to be performed outside the hazard area by qualified personnel.

Check mark

Incorrect maintenance/repair! Risk of injury and damage to the device. Have repairs and part replacements carried out only by specially trained staff or a WAGNER service center.

Check mark

Before all work on the device and in the event of work interruptions: Switch off the energy/compressed air supply. Relieve spray gun and device pressure. Secure the spray gun against actuation. Observe the operating manual and service manuals at all times when carrying out work.

Check mark

WARNING! Incorrect maintenance! Risk of injury and damage to the device. If contact with powder products or cleaning agents causes skin irritation, appropriate precautionary measures must be taken, e.g., wearing protective clothing.

Check mark

The footwear worn by operating staff must comply with EN ISO 20344. The measured insulation resistance must not exceed 100 megohms.

Check mark

The protective clothing, including gloves, must comply with EN ISO 1149-5. The measured insulation resistance must not exceed 100 megohms.

Run this procedureArrow right

Parts for Wagner Portable Powdercoat Unit EPG-Sprint X

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

PG-SPRINT X Control Unit (For Manual and Automatic Systems)

2324731

Thermal Delay Fuses 1.0 A (Included in EPG-SPRINT X)

9951117

Mains Cable Europe

241270

Mains Cable Switzerland

241271

Mains Cable USA

264626

PG-SPRINT X Control Unit (For Manual and Automatic Systems)

2324731

Thermal Delay Fuses 1.0 A (Included in EPG-SPRINT X)

9951117

Mains Cable Europe

241270

Mains Cable Switzerland

241271

Mains Cable USA

264626

PG-SPRINT X Control Unit (For Manual and Automatic Systems)

2324731

Thermal Delay Fuses 1.0 A (Included in EPG-SPRINT X)

9951117

Mains Cable Europe

241270

Mains Cable Switzerland

241271

Mains Cable USA

264626

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

Explore Other Assets