

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane Series R™ Helical Rotary Chiller RTAC375S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Factory (initial) Refrigerant Charging Procedure
EXVs are OPEN
Attach vacuum hoses to evaporator service valves (one per circuit). Open service valves.
Attach charging hoses to the charging port on the liquid line filter (one per circuit). The filters contain a port with a ¼” (6mm) flare.
Begin semi-automatic vacuum procedure.
Vacuum is complete (indicated)
Manually isolate the unit from vacuum.
Charge unit through the filter housing port per Table 1 - Table 4.
When charging is complete, shut evaporator service valve and disconnect vacuum and charging hoses.
Sign off on the refrigerant charging procedure
Adding Charge:
Warning: This procedure should be followed when adding charge to an undercharged unit.
Attach charging hose to evaporator service valve (3/8” (9mm) flare). Open service valve.
Add 10 pounds of refrigerant (R-134a) charge.
Close valve, remove charging hose and start unit. Monitor subcooling.
If subcooling is still insufficient, return to step #1.
NOTE: Proper subcooling can be determined from run log history, service experience, or by contacting Trane technical service.
Sign off on the procedure
Refrigerant and Oil Charge Management
Proper oil and refrigerant charge is essential for proper unit operation, unit perfor-mance, and environmental protection. Only trained and licensed service personnal should service the chiller.
Some symptoms of a refrigerant under-charged unit:
• Low subcooling
• Higher than normal discharge superheat
• Bubbles in EXV sight glass
• Low liquid level diagnostic
• Larger than normal evaporator approach temperatures (leaving water temperature - saturated evaporator temperature)
• Low evaporator refrigerant temperature limit
• Low refrigerant temperature cutout diagnostic
Inspection Checklist
Inspect the individual pieces of the shipment for obvious damage
Inspect the unit for concealed damage
If concealed damage is discovered, stop unpacking the shipment.
Upload photos of the damage
Provide evidence that the damage did not occur after delivery
Notify the carrier’s terminal of the damage immediately, by phone and by mail
Notify the Trane sales representative and arrange for repair
Do not repair the unit until damage is inspected by the carrier’s representative.
Sign off on the inspection checklist
1 Yearly Series R™ Helical Rotary Chiller Maintenance
1. Perform all weekly and monthly procedures.
2. Check oil sump oil level while unit is off.
NOTE: Routine changing of the oil is not required. Use an oil analysis to determine the condition of the oil.
3. Have a qualified laboratory perform a compressor oil analysis to determine sys-tem moisture content and acid level. This analysis is a valuable diagnostic tool.
4. Contact a qualified service organization to leak test the chiller, to check operating and safety controls, and to inspect electrical components for deficiencies.
5. Inspect all piping components for leakage and damage. Clean out any inline strainers.
6. Clean and repaint any areas that show signs of corrosion.
7. Clean the condenser coils.
WARNING
Access the parts list for your equipment in MaintainX.
Isolator
X10140305640
Isolator
X10140305640
Isolator
X10140305640
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













