MaintainX Logo
EnterprisePricing
Trane

Trane Series R™ Helical Rotary Chiller RTAC375S

Need answers fast?
Explore the manual using AI.

Trane Series R™ Helical Rotary Chiller RTAC375S
Trane Series R™ Helical Rotary Chiller RTAC375S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane Series R™ Helical Rotary Chiller RTAC375S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane Series R™ Helical Rotary Chiller RTAC375S

Trane Series R™ Helical Rotary Chiller RTAC375S

Create an account to install this asset package.

Maintenance Plans for Trane Series R™ Helical Rotary Chiller Model RTAC375S

Integrate maintenance plans directly into your work orders in MaintainX.

Factory (initial) Refrigerant Charging Procedure

Check mark

EXVs are OPEN

Check mark

Attach vacuum hoses to evaporator service valves (one per circuit). Open service valves.

Check mark

Attach charging hoses to the charging port on the liquid line filter (one per circuit). The filters contain a port with a ¼” (6mm) flare.

Check mark

Begin semi-automatic vacuum procedure.

Check mark

Vacuum is complete (indicated)

Check mark

Manually isolate the unit from vacuum.

Check mark

Charge unit through the filter housing port per Table 1 - Table 4.

Check mark

When charging is complete, shut evaporator service valve and disconnect vacuum and charging hoses.

Check mark

Sign off on the refrigerant charging procedure

Run this procedureArrow right

Adding Charge:

Check mark

Warning: This procedure should be followed when adding charge to an undercharged unit.

Check mark

Attach charging hose to evaporator service valve (3/8” (9mm) flare). Open service valve.

Check mark

Add 10 pounds of refrigerant (R-134a) charge.

Check mark

Close valve, remove charging hose and start unit. Monitor subcooling.

Check mark

If subcooling is still insufficient, return to step #1.

Check mark

NOTE: Proper subcooling can be determined from run log history, service experience, or by contacting Trane technical service.

Check mark

Sign off on the procedure

Run this procedureArrow right

Refrigerant and Oil Charge Management

Check mark

Proper oil and refrigerant charge is essential for proper unit operation, unit perfor-mance, and environmental protection. Only trained and licensed service personnal should service the chiller.

Check mark

Some symptoms of a refrigerant under-charged unit:

Check mark

• Low subcooling

Check mark

• Higher than normal discharge superheat

Check mark

• Bubbles in EXV sight glass

Check mark

• Low liquid level diagnostic

Check mark

• Larger than normal evaporator approach temperatures (leaving water temperature - saturated evaporator temperature)

Check mark

• Low evaporator refrigerant temperature limit

Check mark

• Low refrigerant temperature cutout diagnostic

Run this procedureArrow right

Inspection Checklist

Check mark

Inspect the individual pieces of the shipment for obvious damage

Check mark

Inspect the unit for concealed damage

Check mark

If concealed damage is discovered, stop unpacking the shipment.

Check mark

Upload photos of the damage

Check mark

Provide evidence that the damage did not occur after delivery

Check mark

Notify the carrier’s terminal of the damage immediately, by phone and by mail

Check mark

Notify the Trane sales representative and arrange for repair

Check mark

Do not repair the unit until damage is inspected by the carrier’s representative.

Check mark

Sign off on the inspection checklist

Run this procedureArrow right

1 Yearly Series R™ Helical Rotary Chiller Maintenance

Check mark

1. Perform all weekly and monthly procedures.

Check mark

2. Check oil sump oil level while unit is off.

Check mark

NOTE: Routine changing of the oil is not required. Use an oil analysis to determine the condition of the oil.

Check mark

3. Have a qualified laboratory perform a compressor oil analysis to determine sys-tem moisture content and acid level. This analysis is a valuable diagnostic tool.

Check mark

4. Contact a qualified service organization to leak test the chiller, to check operating and safety controls, and to inspect electrical components for deficiencies.

Check mark

5. Inspect all piping components for leakage and damage. Clean out any inline strainers.

Check mark

6. Clean and repaint any areas that show signs of corrosion.

Check mark

7. Clean the condenser coils.

Check mark

WARNING

Run this procedureArrow right

Parts for Trane Series R™ Helical Rotary Chiller RTAC375S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Isolator

X10140305640

Isolator

X10140305640

Isolator

X10140305640

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets