The Trane Series R™ Helical Rotary Chiller RTAC350S is a high-efficiency industrial chiller designed for optimal cooling performance. Known for its reliability and advanced technology, this model is ideal for large commercial applications, ensuring energy savings and consistent operation.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane Series R™ Helical Rotary Chiller RTAC350S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane Series R™ Helical Rotary Chiller RTAC350S

Trane Series R™ Helical Rotary Chiller RTAC350S

Create an account to install this asset package.

Maintenance Plans for Trane Series R™ Helical Rotary Chiller Model RTAC350S

Integrate maintenance plans directly into your work orders in MaintainX.

Clearances

Check mark

Ensure enough space around the outdoor unit for unrestricted access to all service points.

Check mark

Enter the unit dimensions as per submittal drawings

Check mark

Is there a minimum of 4 feet (1.2 m) clearance for compressor service?

Check mark

Is there sufficient clearance for the opening of control panel doors?

Check mark

Ensure unobstructed flow of condenser air to maintain chiller capacity and operating efficiency.

Check mark

Is there sufficient flow of air across the condenser heat transfer surface?

Check mark

Is there any warm air recirculation or coil starvation?

Check mark

Ensure no debris, trash, supplies etc. accumulate in the vicinity of the unit.

Check mark

Is the condenser coil free of debris?

Run this procedureArrow right

Adding Charge:

Check mark

This procedure should be followed when adding charge to an undercharged unit. When low charge is indicated by low subcooling in the liquid line, charge should be added until sufficient subcooling is achieved.

Check mark

1. Attach charging hose to evaporator service valve (3/8” (9mm) flare). Open service valve.

Check mark

2. Add 10 pounds of refrigerant (R-134a) charge.

Check mark

3. Close valve, remove charging hose and start unit. Monitor subcooling.

Check mark

4. If subcooling is still insufficient, return to step #1.

Check mark

NOTE: Proper subcooling can be determined from run log history, service experience, or by contacting Trane technical service.;

Run this procedureArrow right

1 Monthly Series R™ Helical Rotary Chiller Maintenance

Check mark

Perform all weekly maintenance procedures

Check mark

Record the system subcooling

Check mark

Make any repairs necessary

Run this procedureArrow right

Inspection Checklist

Check mark

Inspect the individual pieces of the shipment for obvious damage

Check mark

Inspect the unit for concealed damage

Check mark

Date of concealed damage report

Check mark

Upload photos of the damage

Check mark

Evidence that the damage did not occur after delivery

Check mark

Notify the carrier’s terminal of the damage immediately, by phone and by mail

Check mark

Notify the Trane sales representative and arrange for repair

Check mark

Do not repair the unit until damage is inspected by the carrier’s representative

Check mark

Sign off on the inspection checklist

Run this procedureArrow right

Compressor Replacement

Check mark

Isolate the refrigerant charge outside of the compressor and close all four valves leading to the compressor?

Check mark

Disconnect power to the chiller. Remove the electrical junction box cover and disconnect the wires?

Check mark

WARNING: Hazardous Voltage! Disconnect all electric power, including remote disconnects before servicing. Follow proper lockout/tagout procedures to ensure the power can not be inadvertently energized. Failure to disconnect power before servicing could result in death or serious injury.

Check mark

Evacuate the compressor through the service fitting provided. If the unit does not have suction service valves, this will include evacuating the low side of the system as well. Disconnect all four lines attached to the compressor, as well as the junction box. Remove three screws from the bottom of the compressor?

Check mark

Remove the compressor by sliding it out of the chiller onto a well supported skid or other platform. The compressor is very heavy, so insure that the support is sturdy. A piece of 1x4 lumber placed between the isolators works well to support the compressor feet as it is pulled from the chiller?

Check mark

Install the new compressor. Reinstall all lines, wires, and screws. Open the service valves, and trim charge as required?

Check mark

Sign off on the compressor replacement

Run this procedureArrow right

Parts for Trane Series R™ Helical Rotary Chiller RTAC350S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Isolator

X10140305640

Isolator

X10140305640

Isolator

X10140305640

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets