Trane

Trane CenTraVac™ Water-Cooled Chiller CVHG - 920-1100 - 892 - 142M / 142L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHG - 920-1100 - 892 - 142M / 142L
Trane CenTraVac™ Water-Cooled Chiller CVHG - 920-1100 - 892 - 142M / 142L

The Trane CenTraVac™ Water-Cooled Chiller CVHG model, ranging from 920 to 1100 tons, is designed for high efficiency and reliability in large-scale cooling applications. This industrial chiller is ideal for commercial buildings and manufacturing processes, ensuring optimal temperature control and energy savings.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHG - 920-1100 - 892 - 142M / 142L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHG - 920-1100 - 892 - 142M / 142L

Trane CenTraVac™ Water-Cooled Chiller CVHG - 920-1100 - 892 - 142M / 142L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHG - 920-1100 - 892 - 142M / 142L

Integrate maintenance plans directly into your work orders in MaintainX.

3 Yearly Evaporator Maintenance

Check mark

Clean evaporator

Check mark

Is the evaporator part of a closed circuit?

Check mark

If yes, proceed to step 4. If no, proceed to step 5.

Check mark

Has it been three years since the last cleaning?

Check mark

For open evaporator systems, such as air washers, proceed with the following steps.

Check mark

Is the evaporator visibly dirty?

Check mark

If yes, proceed to cleaning. If no, inspection is complete.

Check mark

Cleaning steps

Check mark

Sign off on the evaporator maintenance

Run this procedureArrow right

1 Yearly Chiller Lubrication

Check mark

Lubricate the gantries annually

Check mark

Select the lubricant used for gantries

Check mark

Lubricate the hinges annually

Check mark

Select the lubricant used for hinges

Check mark

Sign off on the lubrication process

Run this procedureArrow right

1 Yearly Exterior Parts Maintenance

Check mark

Chiller shut down?

Check mark

Inlet guide vane linkage check

Check mark

Clean and touch-up painted surfaces as needed

Check mark

Repair deteriorated, torn, or missing insulation

Check mark

Sign off on the exterior parts maintenance

Run this procedureArrow right

Initial 1 Month Waterbox Maintenance

Check mark

Trane recommends that coated waterboxes/tubesheets - regardless of the type of protective coating included - be taken out of service within the first one to three months of operation for inspection.

Check mark

Any voids or defects identified upon inspection?

Check mark

If voids or defects are identified, they must be repaired.

Check mark

Is the water quality known to be highly supportive of corrosion (i.e., sea water, etc.)?

Check mark

If yes, inspect the coating system at one month.

Check mark

Is the water quality known to be relatively benign (i.e., normal treated and clean condenser water)?

Check mark

If yes, inspect the coating system within three months.

Check mark

Did the initial inspections show no problems?

Check mark

Only when initial inspections show no problems are present should subsequent maintenance intervals be increased.

Run this procedureArrow right

1 Yearly Chiller Leak Test

Check mark

WARNING: Explosion Hazard! Never use an open flame to detect gas leaks. Use a leak test solution for leak testing.

Check mark

WARNING: Hazardous Pressures! If a heat source is required to raise the tank pressure during removal of refrigerant from cylinders, use only warm water or heat blankets to raise the tank temperature. Do not exceed a temperature of 150°F. Do not under any circumstances apply direct flame to any portion of the cylinder.

Check mark

Important: If leak testing is required, contact a Trane Service Agency;

Check mark

Shut down the chiller

Check mark

Check purge times and unit performance logs

Check mark

Pressure leak test if warranted

Check mark

Review oil analysis

Check mark

Submit refrigerant sample for analysis if required

Check mark

Inspect unit for any signs of refrigerant or oil leakage

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHG - 920-1100 - 892 - 142M / 142L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets