The Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 is a high-efficiency industrial chiller designed for large-scale cooling applications. Known for its reliability and performance, this model offers advanced features that ensure optimal energy use and system longevity. Ideal for commercial and industrial settings, it provides robust cooling solutions.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 080S / 080L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Chiller Maintenance
Operate the tang operators manually and check for any abnormalities
Drain contents of the rupture disk and purge discharge vent-line drip-leg into an evacuated waste container
Do this more often if the purge is operated excessively
Apply oil to any exposed metal parts to prevent rust
Sign off on the chiller maintenance
1 Yearly Chiller Maintenance
Contact a qualified service organization to determine when to conduct a complete examination of the unit to discern the condition of the compressor and internal components
Check for chronic air leaks
Check for evaporator water tube leaks
Check for condenser water tube leaks
Sign off on the yearly chiller maintenance
1 Yearly Compressor/Motor Inspection
Shut down the chiller
Motor continuity check
Motor meg test
Check motor terminals
Inspect motor terminal board
Check inlet guide vanes (IGV) for abnormalities
Sign off on the compressor/motor inspection
1 Yearly Condenser Inspection
Shut down the chiller
Inspect for fouling and scaling in tubes
Check operation of condenser water flow sensing device
Factory recommendation to eddy current test tubes every three years
Sign off on the condenser inspection
1 Yearly Exterior Parts Maintenance
Chiller shut down?
Inlet guide vane linkage checked?
Painted surfaces cleaned and touched-up as needed?
Deteriorated, torn, or missing insulation repaired?
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX