Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 080S / 080L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Compressor/Motor Inspection
Shut down the chiller
Motor continuity check
Motor meg test
Check motor terminals
Inspect motor terminal board
Check inlet guide vanes (IGV) for abnormalities
Sign off on the compressor/motor inspection
Initial 1 Month Waterbox Maintenance
Trane recommends that coated waterboxes/tubesheets - regardless of the type of protective coating included - be taken out of service within the first one to three months of operation for inspection.
Any voids or defects identified upon inspection?
If voids or defects are identified, they must be repaired.
Is the water quality known to be highly supportive of corrosion (i.e., sea water, etc.)?
If yes, inspect the coating system at one month.
Is the water quality known to be relatively benign (i.e., normal treated and clean condenser water)?
If yes, inspect the coating system within three months.
Did the initial inspections show no problems?
Only when initial inspections show no problems are present should subsequent maintenance intervals be increased.
1 Yearly Condenser Inspection
Shut down the chiller
Inspect for fouling and scaling in tubes
Check operation of condenser water flow sensing device
Factory recommendation to eddy current test tubes every three years
Sign off on the condenser inspection
1 Daily Chiller Maintenance
Chiller's evaporator pressure
Chiller's condenser pressure
Oil tank pressure
Differential oil pressure
Discharge oil pressure
Compare the readings with the values provided in the general maintenance
Check the oil level in the chiller oil sump using the two sight glasses provided in the oil sump head. When the unit is operating, the oil level should be visible in the lower sight glass
Complete logs on a daily basis
1 Yearly Purge Unit Inspection
Shut down the chiller
Review the purge Installation, Operation, and Maintenance manual and follow maintenance and/or inspection items identified
Review purge pump-out data
Review overall operation of purge and service as necessary
Sign off on the purge unit inspection
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX