The Trane CenTraVac™ Water-Cooled Chiller CVHF is a high-efficiency cooling solution designed for large commercial applications. With models ranging from 350 to 910 tons, this chiller offers reliable performance and advanced technology for optimal energy savings and environmental sustainability.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 142M / 142L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 1 Monthly Waterbox Maintenance
Trane recommends that coated waterboxes/tubesheets, regardless of the type of protective coating included, be taken out of service within the first one to three months of operation for inspection.
Any voids or defects identified upon inspection?
If voids or defects are identified, they must be repaired.
Is the water quality known to be highly supportive of corrosion (i.e., sea water, etc.)?
If yes, inspect the coating system at one month.
Is the water quality known to be relatively benign (i.e., normal treated and clean condenser water)?
If yes, inspect the coating system within three months.
Did the initial inspections show no problems?
Only when initial inspections show no problems are present should subsequent maintenance intervals be increased.
1 Yearly Oil System Inspection
Shut down the chiller
Perform Annual oil analysis (follow recommendations)
Clean and lubricate oil system as required
Electrical inspection
Pump motor continuity check
Run oil pump and check differential oil pressure
Sign off on the yearly oil system inspection
2 Monthly Sacrificial Anodes Replacement
- The replacement schedule for the optional zinc or magnesium anodes can vary greatly with the aggressiveness of the water that is in the system
- Some sites could require anode replacement every two to three months while other sites may require anode replacement every two to three years
1. Trane recommends inspection of anodes for wear sometime within the first several months of the anodes being placed into service
2. If the observed loss of anode material is small, then the interval between subsequent inspections can be lengthened
3. Replace the anode and/ or shorten the inspection interval if the anode has lost 50 percent or more of its original mass
4. If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application
NOTICE
Equipment Damage!
Failure to follow instructions could result in equipment damage
1 Yearly Chiller Leak Test
WARNING: Explosion Hazard! Never use an open flame to detect gas leaks. Use a leak test solution for leak testing.
WARNING: Hazardous Pressures! If a heat source is required to raise the tank pressure during removal of refrigerant from cylinders, use only warm water or heat blankets to raise the tank temperature. Do not exceed a temperature of 150°F. Do not under any circumstances apply direct flame to any portion of the cylinder.
Important: If leak testing is required, contact a Trane Service Agency.
Shut down the chiller
Check purge times and unit performance logs
Review oil analysis
Submit refrigerant sample for analysis if required
Inspect unit for any signs of refrigerant or oil leakage
Check unit for any loose screws on flange, volutes, or casing
1 Yearly Chiller Lubrication
- Lubricate the gantries annually
1. Use ConocoPhillips Gantries MegaPlex® XD3 (gray in color), LPS® MultiPlex Multi-Purpose (blue in color), or equivalent
- Lubricate the hinges annually
1. Use ConocoPhillips MegaPlex® XD3 (gray in color), LPS® MultiPlex Multi- Purpose (blue in color), or equivalent;
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX