The Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 050L / 050L is a high-efficiency cooling solution designed for large commercial applications. Known for its reliability and performance, this chiller optimizes energy use while providing consistent temperature control. Ideal for industrial settings, it ensures effective climate management.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-570 - 588 - 050L / 050L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Exterior Parts Maintenance
- Shut down the chiller once each year to check the items of Exterior
1. Inlet guide vane linkage
2. Clean and touch-up painted surfaces as needed
3. Repair deteriorated, torn, or missing insulation;
1 Yearly Chiller Leak Test
- Shut down the chiller once each year to check the items for Leak Test Chiller
1. Check purge times and unit performance logs. If warranted, pressure leak test
2. Review oil analysis. If required, submit refrigerant sample for analysis
3. Inspect unit for any signs of refrigerant or oil leakage
4. Check unit for any loose screws on flange, volutes, or casing
WARNING
Explosion Hazard!
Failure to follow safe leak test procedures below could result in death or serious injury or equipment or property-only-damage
Never use an open flame to detect gas leaks. Use a leak test solution for leak testing
1 Yearly Control Circuits Inspection
- Shut down the chiller once each year to check the items of Control Circuits
1. Verify control parameters
2. Test appropriate sensors for accuracy
3. Ensure sensors are properly seated in wells with thermopaste installed
4. Check evaporator leaving water temperature low temperature cutout setpoint
5. Condenser high pressure switch check-out
6. Check adjustment and operation of the inlet guide vane actuator;
1 Yearly Chiller Lubrication
- Lubricate the gantries annually
1. Use ConocoPhillips Gantries MegaPlex® XD3 (gray in color), LPS® MultiPlex Multi-Purpose (blue in color), or equivalent
- Lubricate the hinges annually
1. Use ConocoPhillips MegaPlex® XD3 (gray in color), LPS® MultiPlex Multi- Purpose (blue in color), or equivalent;
3 Yearly Tubes Maintenance
- Use a non-destructive tube test to inspect the condenser and evaporator tubes
1. It may be desirable to perform tube tests on these components at more frequent intervals depending upon chiller application
2. This is especially true of critical process equipment
3. Ask your Sales account manager for a copy of engineering bulletin (CTV-PRB024*-EN) for clarification of the role of eddy current testing in chiller maintenance by providing information about eddy current technology and heat exchanger tubing;
Access the parts list for your equipment in MaintainX.
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX