MaintainX Logo
EnterprisePricing
Trane

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080S

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080S
Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080S

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080S

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 300-500 - 379 - 080S / 080S

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Compressor/Motor Inspection

Check mark

Shut down the chiller

Check mark

Motor continuity check

Check mark

Motor meg test

Check mark

Check motor terminals

Check mark

Inspect motor terminal board

Check mark

Check inlet guide vanes (IGV) for abnormalities

Check mark

Sign off on the compressor/motor inspection

Run this procedureArrow right

3 Monthly Chiller Maintenance

Check mark

Clean all water strainers in the water piping system

Check mark

Inspect waterbox coatings within the first 1–3 months to determine a required maintenance schedule for your job site

Check mark

Inspect waterbox anodes within the first 1–3 months to determine a required maintenance schedule for your job site

Check mark

Sign off on the 3 Monthly Chiller Maintenance

Run this procedureArrow right

1 Yearly Condenser Cleaning

Check mark

NOTICE: Proper Water Treatment Required! The use of untreated or improperly treated water could result in scaling, erosion, corrosion, algae or slime. Use the services of a qualified water treatment specialist to determine what water treatment, if any, is required. Trane assumes no responsibility for equipment failures which result from untreated or improperly treated water, or saline or brackish water.

Check mark

Condenser tube fouling is indicated when the approach temperature (the difference between the condensing refrigerant temperature and the leaving condenser water temperature) is higher than predicted.

Check mark

If the annual condenser tube inspection indicates that the tubes are fouled, two cleaning methods— mechanical and chemical—can be used to rid the tubes of contaminants. Use the mechanical cleaning method to remove sludge and loose material from smooth-bore tubes.

Check mark

To clean other types of tubes including internally- enhanced types, consult a qualified service organization for recommendations.

Check mark

Waterbox covers removed?

Check mark

Round nylon or brass bristled brush worked in and out of each of the condenser water tubes to loosen the sludge?

Check mark

Condenser water tubes thoroughly flushed with clean water?

Check mark

Scale deposits are best removed by chemical means. Be sure to consult any qualified chemical house in the area (one familiar with the local water supply’s chemical mineral content) for a recommended cleaning solution suitable for the job.

Check mark

NOTICE: Unit Corrosion Damage! Failure to follow instructions below could result in corrosion damage to the unit and tubes. Follow proper procedures when using corrosive chemicals to clean water side of unit. If unsure, it is recommended that the services of a qualified chemical cleaning firm be used.

Run this procedureArrow right

1 Yearly Purge Unit Inspection

Check mark

Shut down the chiller

Check mark

Review the purge Installation, Operation, and Maintenance manual and follow maintenance and/or inspection items identified

Check mark

Review purge pump-out data

Check mark

Review overall operation of purge and service as necessary

Check mark

Sign off on the purge unit inspection

Run this procedureArrow right

6 Monthly Chiller Lubrication

Check mark

Lubricate the vane control linkage bearings, ball joints, and pivot points

Check mark

Lubricate vane operator tang O- rings

Check mark

Lubricate the oil filter shutoff valve O-rings

Check mark

Sign off on the chiller lubrication

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets