The Trane CenTraVac™ Water-Cooled Chiller CVHF model offers efficient cooling solutions for industrial applications. With a capacity range of 300-500 tons, this chiller is designed for reliability and performance, making it ideal for large-scale HVAC systems. Optimize your cooling needs with this robust and energy-efficient asset.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2 Monthly Sacrificial Anodes Replacement
Warning: Equipment Damage! Failure to follow instructions could result in equipment damage
Do NOT use Teflon-based tape or paste on anode; a small amount of liquid sealant (Loctite® 242 or equivalent) may be applied to prevent leakage when installing an anode, but do not apply so much sealant that it prevents the necessary electrical connection between the anode and the waterbox
As needed after draining the waterbox, use a 2-1/2 in. (63.5 mm) wrench to remove/install Trane-supplied waterbox anodes
Inspection of anodes for wear within the first several months of the anodes being placed into service
If the observed loss of anode material is small, then the interval between subsequent inspections can be lengthened
Replace the anode and/ or shorten the inspection interval if the anode has lost 50 percent or more of its original mass
If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application
Sign off on the anode replacement
3 Yearly Tubes Maintenance
Use a non-destructive tube test to inspect the condenser and evaporator tubes
Tube test performed on condenser?
Tube test performed on evaporator?
It may be desirable to perform tube tests on these components at more frequent intervals depending upon chiller application
This is especially true of critical process equipment
Ask your Sales account manager for a copy of engineering bulletin (CTV-PRB024*-EN) for clarification of the role of eddy current testing in chiller maintenance by providing information about eddy current technology and heat exchanger tubing
Sign off on the tube maintenance
6 Monthly Chiller Lubrication
Lubricate the vane control linkage bearings, ball joints, and pivot points
Lubricate vane operator tang O- rings
Lubricate the oil filter shutoff valve O-rings
Sign off on the chiller lubrication
1 Yearly Control Circuits Inspection
Shut down the chiller
Verify control parameters
Test appropriate sensors for accuracy
Ensure sensors are properly seated in wells with thermopaste installed
Check evaporator leaving water temperature low temperature cutout setpoint
Condenser high pressure switch check-out
Check adjustment and operation of the inlet guide vane actuator
Sign off on the control circuits inspection
1 Yearly Purge Unit Inspection
Shut down the chiller
Upload the purge Installation, Operation, and Maintenance manual
Follow maintenance and/or inspection items identified in the manual
Enter purge pump-out data
Review overall operation of purge
Service as necessary
Sign off on the purge unit inspection
Access the parts list for your equipment in MaintainX.
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX