MaintainX Logo
EnterprisePricing
Trane

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080L
Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080L

The Trane CenTraVac™ Water-Cooled Chiller CVHF model offers efficient cooling solutions for industrial applications. With a capacity range of 300-500 tons, this chiller is designed for reliability and performance, making it ideal for large-scale HVAC systems. Optimize your cooling needs with this robust and energy-efficient asset.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080L

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 300-500 - 379 - 080S / 080L

Integrate maintenance plans directly into your work orders in MaintainX.

2 Monthly Sacrificial Anodes Replacement

Check mark

Warning: Equipment Damage! Failure to follow instructions could result in equipment damage

Check mark

Do NOT use Teflon-based tape or paste on anode; a small amount of liquid sealant (Loctite® 242 or equivalent) may be applied to prevent leakage when installing an anode, but do not apply so much sealant that it prevents the necessary electrical connection between the anode and the waterbox

Check mark

As needed after draining the waterbox, use a 2-1/2 in. (63.5 mm) wrench to remove/install Trane-supplied waterbox anodes

Check mark

Inspection of anodes for wear within the first several months of the anodes being placed into service

Check mark

If the observed loss of anode material is small, then the interval between subsequent inspections can be lengthened

Check mark

Replace the anode and/ or shorten the inspection interval if the anode has lost 50 percent or more of its original mass

Check mark

If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application

Check mark

Sign off on the anode replacement

Run this procedureArrow right

3 Yearly Tubes Maintenance

Check mark

Use a non-destructive tube test to inspect the condenser and evaporator tubes

Check mark

Tube test performed on condenser?

Check mark

Tube test performed on evaporator?

Check mark

It may be desirable to perform tube tests on these components at more frequent intervals depending upon chiller application

Check mark

This is especially true of critical process equipment

Check mark

Ask your Sales account manager for a copy of engineering bulletin (CTV-PRB024*-EN) for clarification of the role of eddy current testing in chiller maintenance by providing information about eddy current technology and heat exchanger tubing

Check mark

Sign off on the tube maintenance

Run this procedureArrow right

6 Monthly Chiller Lubrication

Check mark

Lubricate the vane control linkage bearings, ball joints, and pivot points

Check mark

Lubricate vane operator tang O- rings

Check mark

Lubricate the oil filter shutoff valve O-rings

Check mark

Sign off on the chiller lubrication

Run this procedureArrow right

1 Yearly Control Circuits Inspection

Check mark

Shut down the chiller

Check mark

Verify control parameters

Check mark

Test appropriate sensors for accuracy

Check mark

Ensure sensors are properly seated in wells with thermopaste installed

Check mark

Check evaporator leaving water temperature low temperature cutout setpoint

Check mark

Condenser high pressure switch check-out

Check mark

Check adjustment and operation of the inlet guide vane actuator

Check mark

Sign off on the control circuits inspection

Run this procedureArrow right

1 Yearly Purge Unit Inspection

Check mark

Shut down the chiller

Check mark

Upload the purge Installation, Operation, and Maintenance manual

Check mark

Follow maintenance and/or inspection items identified in the manual

Check mark

Enter purge pump-out data

Check mark

Review overall operation of purge

Check mark

Service as necessary

Check mark

Sign off on the purge unit inspection

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 080S / 080L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets