MaintainX Logo
EnterprisePricing
Trane

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 050S / 050S

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 050S / 050S
Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 050S / 050S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 050S / 050S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 050S / 050S

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 050S / 050S

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 300-500 - 379 - 050S / 050S

Integrate maintenance plans directly into your work orders in MaintainX.

General Chiller Maintenance

Check mark

WARNING: Hazardous Voltage w/Capacitors!

Check mark

Failure to disconnect power and discharge capacitors before servicing could result in death or serious injury.

Check mark

Disconnect all electric power, including remote disconnects and discharge all motor start/run capacitors before servicing.

Check mark

Follow proper lockout/tagout procedures to ensure the power cannot be inadvertently energized.

Check mark

NOTICE: Check Purge Run-Time for Unit Hermetic Integrity!

Check mark

Failure to follow instructions below could result in chiller damage.

Check mark

If frequent purging is required, monitor purge pumpout rate, and identify and correct source of air or water leak as soon as possible to prevent moisture contamination caused by leakage.

Check mark

NOTICE: Do Not Use Non-Compatible Parts or Materials!

Check mark

Use of non-compatible parts or materials could result in equipment damage.

Run this procedureArrow right

1 Yearly Evaporator Inspection

Check mark

- Shut down the chiller once each year to check the items of Evaporator

Check mark

1. Inspect for fouling and scaling in tubes

Check mark

2. Check operation of evaporator water flow sensing device

Check mark

3. Factory recommendation to eddy current test tubes every three years;

Run this procedureArrow right

3 Yearly Evaporator Maintenance

Check mark

Clean evaporator

Check mark

Is the evaporator part of a closed circuit?

Check mark

If the evaporator is part of a closed circuit, it may not accumulate appreciable amounts of scale or sludge.

Check mark

Did you clean the evaporator?

Check mark

Normally, cleaning every three years is sufficient.

Check mark

Is the evaporator part of an open system, such as air washers?

Check mark

If yes, periodic inspection and cleaning is recommended.

Check mark

Sign off on the evaporator maintenance

Run this procedureArrow right

6 Monthly Chiller Maintenance

Check mark

Operate the tang operators manually and check for any abnormalities

Check mark

Drain contents of the rupture disk and purge discharge vent-line drip-leg into an evacuated waste container

Check mark

Do this more often if the purge is operated excessively

Check mark

Apply oil to any exposed metal parts to prevent rust

Run this procedureArrow right

2 Monthly Sacrificial Anodes Replacement

Check mark

- The replacement schedule for the optional zinc or magnesium anodes can vary greatly with the aggressiveness of the water that is in the system

Check mark

- Some sites could require anode replacement every two to three months while other sites may require anode replacement every two to three years

Check mark

1. Trane recommends inspection of anodes for wear sometime within the first several months of the anodes being placed into service

Check mark

2. If the observed loss of anode material is small, then the interval between subsequent inspections can be lengthened

Check mark

3. Replace the anode and/ or shorten the inspection interval if the anode has lost 50 percent or more of its original mass

Check mark

4. If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application

Check mark

NOTICE

Check mark

Equipment Damage!

Check mark

Failure to follow instructions could result in equipment damage

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 050S / 050S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets