Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 379 - 050L / 050L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Oil System Inspection
Shut down the chiller
Perform Annual oil analysis (follow recommendations)
Clean and lubricate oil system as required
Electrical inspection
Pump motor continuity check
Run oil pump and check differential oil pressure
Sign off on the yearly oil system inspection
1 Yearly Control Circuits Inspection
Shut down the chiller
Verify control parameters
Test appropriate sensors for accuracy
Ensure sensors are properly seated in wells with thermopaste installed
Check evaporator leaving water temperature low temperature cutout setpoint
Condenser high pressure switch check-out
Check adjustment and operation of the inlet guide vane actuator
Sign off on the control circuits inspection
General Chiller Maintenance
Check chiller for normal operation
Condenser pressure
Normal pressure readings for ASME condenser
Oil tank pressure
Discharge oil pressure
Approximate Evaporator Pressure
Approximate Condenser Pressure
Oil Sump Temperature Unit not running
Oil Sump Temperature Unit running
1 Yearly Chiller Leak Test
WARNING: Explosion Hazard! Never use an open flame to detect gas leaks. Use a leak test solution for leak testing.
WARNING: Hazardous Pressures! If a heat source is required to raise the tank pressure during removal of refrigerant from cylinders, use only warm water or heat blankets to raise the tank temperature. Do not exceed a temperature of 150°F. Do not under any circumstances apply direct flame to any portion of the cylinder.
Important: If leak testing is required, contact a Trane Service Agency;
Shut down the chiller
Check purge times and unit performance logs
Pressure leak test if warranted
Review oil analysis
Submit refrigerant sample for analysis if required
Inspect unit for any signs of refrigerant or oil leakage
6 Monthly Chiller Lubrication
Lubricate the vane control linkage bearings, ball joints, and pivot points
Lubricate vane operator tang O- rings
Lubricate the oil filter shutoff valve O-rings
Sign off on the chiller lubrication
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX