The Trane CenTraVac™ Water-Cooled Chiller CVHF is a high-efficiency cooling solution designed for large commercial applications. With models ranging from 300 to 500 tons, it offers reliable performance and advanced technology to optimize energy use and reduce operational costs. Ideal for industrial settings, this chiller ensures consistent temperature control and operational efficiency.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 080S / 080S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Condenser Inspection
- Shut down the chiller once each year to check the items of Condenser
1. Inspect for fouling and scaling in tubes
2. Check operation of condenser water flow sensing device
3. Factory recommendation to eddy current test tubes every three years;
6 Monthly Chiller Maintenance
Operate the tang operators manually and check for any abnormalities
Drain contents of the rupture disk and purge discharge vent-line drip-leg into an evacuated waste container
Do this more often if the purge is operated excessively
Apply oil to any exposed metal parts to prevent rust
1 Yearly Condenser Cleaning
NOTICE: Proper Water Treatment Required! The use of untreated or improperly treated water could result in scaling, erosion, corrosion, algae or slime. Use the services of a qualified water treatment specialist to determine what water treatment, if any, is required. Trane assumes no responsibility for equipment failures which result from untreated or improperly treated water, or saline or brackish water.
Condenser tube fouling is indicated when the approach temperature (the difference between the condensing refrigerant temperature and the leaving condenser water temperature) is higher than predicted.
If the annual condenser tube inspection indicates that the tubes are fouled, two cleaning methods— mechanical and chemical—can be used to rid the tubes of contaminants. Use the mechanical cleaning method to remove sludge and loose material from smooth-bore tubes.
To clean other types of tubes including internally- enhanced types, consult a qualified service organization for recommendations.
Follow all instructions in “Waterbox Removal and Installation,” to remove waterbox covers.
Work a round nylon or brass bristled brush (attached to a rod) in and out of each of the condenser water tubes to loosen the sludge.
Thoroughly flush the condenser water tubes with clean water.
Scale deposits are best removed by chemical means. Be sure to consult any qualified chemical house in the area (one familiar with the local water supply’s chemical mineral content) for a recommended cleaning solution suitable for the job.
NOTICE: Unit Corrosion Damage! Failure to follow instructions below could result in corrosion damage to the unit and tubes. Follow proper procedures when using corrosive chemicals to clean water side of unit. If unsure, it is recommended that the services of a qualified chemical cleaning firm be used.
1 Yearly Control Circuits Inspection
Shut down the chiller
Verify control parameters
Test appropriate sensors for accuracy
Ensure sensors are properly seated in wells with thermopaste installed
Check evaporator leaving water temperature low temperature cutout setpoint
Condenser high pressure switch check-out
Check adjustment and operation of the inlet guide vane actuator
Sign off on the control circuits inspection
1 Yearly Purge Unit Inspection
Shut down the chiller
Upload the purge Installation, Operation, and Maintenance manual
Follow maintenance and/or inspection items identified in the manual
Enter purge pump-out data
Review overall operation of purge
Service as necessary
Sign off on the purge unit inspection
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













