MaintainX Logo
EnterprisePricing
Trane

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 080S / 080L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 080S / 080L
Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 080S / 080L

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 080S / 080L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 080S / 080L

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 080S / 080L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 300-500 - 360 - 080S / 080L

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Chiller Maintenance

Check mark

Chiller's evaporator pressure

Check mark

Chiller's condenser pressure

Check mark

Oil tank pressure

Check mark

Differential oil pressure

Check mark

Discharge oil pressure

Check mark

Are the readings within the values provided in the general maintenance?

Check mark

Is the oil level visible in the lower sight glass when the unit is operating?

Check mark

Completion of daily logs

Run this procedureArrow right

6 Monthly Chiller Lubrication

Check mark

- Lubricate the vane control linkage bearings, ball joints, and pivot points

Check mark

- Lubricate vane operator tang O- rings

Check mark

- Lubricate the oil filter shutoff valve O-rings;

Run this procedureArrow right

3 Yearly Evaporator Maintenance

Check mark

Clean Evaporator

Check mark

Is the evaporator part of a closed circuit?

Check mark

If the evaporator is part of a closed circuit, it may not accumulate appreciable amounts of scale or sludge.

Check mark

Has the evaporator been cleaned in the last three years?

Check mark

Normally, cleaning every three years is sufficient.

Check mark

Is the evaporator part of an open system, such as air washers?

Check mark

Periodic inspection and cleaning is recommended on open evaporator systems, such as air washers.

Check mark

Sign off on the evaporator maintenance

Run this procedureArrow right

Initial 1 Month Waterbox Maintenance

Check mark

Trane recommends that coated waterboxes/tubesheets - regardless of the type of protective coating included - be taken out of service within the first one to three months of operation for inspection.

Check mark

Any voids or defects identified upon inspection?

Check mark

If voids or defects are identified, they must be repaired.

Check mark

Is the water quality known to be highly supportive of corrosion (i.e., sea water, etc.)?

Check mark

If yes, inspect the coating system at one month.

Check mark

Is the water quality known to be relatively benign (i.e., normal treated and clean condenser water)?

Check mark

If yes, inspect the coating system within three months.

Check mark

Did the initial inspections show no problems?

Check mark

Only when initial inspections show no problems are present should subsequent maintenance intervals be increased.

Run this procedureArrow right

Initial 1000 Hours/6 Months Chiller Oil Replacement

Check mark

NOTICE: Equipment Damage! Mixing refrigerants or oils could result in equipment damage including bearing damage, introduction of acids into the chiller, or continuous purge pump-out in high-head/high ambient applications.

Check mark

CenTraVac chillers are manufactured with different refrigerant/oil systems: 1) chillers using R-123 refrigerant and OIL00022 compressor oil, and 2) chillers using R-514A refrigerant and OIL00334/OIL00335 compressor oil.

Check mark

Verify proper refrigerant and oil for your chiller and do NOT mix refrigerants or oils!

Check mark

Important: Verify proper refrigerant and compressor oil for your chiller before proceeding!

Check mark

After the first six months of accumulated operation or after 1000 hours operation—whichever comes first—it is recommended to change the oil and filter.

Check mark

After this oil change, it is recommended to subscribe to the Trane annual oil analysis program rather than automatically change the oil as part of scheduled maintenance.

Check mark

Change the oil only if indicated by the oil analysis. Using an oil analysis program will reduce the chiller’s overall lifetime waste oil generation and minimize refrigerant emissions.

Check mark

The analysis determines system moisture content, acid level, and wear metal content of the oil, and can be used as a diagnostic tool. The oil analysis should be performed by a qualified laboratory that is experienced in refrigerant and oil chemistry and in the servicing of Trane® centrifugal chillers.

Check mark

In conjunction with other diagnostics performed by a qualified service technician, oil analyses can provide valuable information on the performance of the chiller to help minimize operating and maintenance costs and maximize its operating life.

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 080S / 080L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets