The Trane CenTraVac™ Water-Cooled Chiller CVHF is a high-efficiency industrial cooling solution designed for large-scale applications. With models ranging from 300 to 500 tons, this chiller provides reliable performance and energy savings, making it ideal for commercial and industrial environments.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 050S / 080S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 050S / 080S

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 050S / 080S

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 300-500 - 360 - 050S / 080S

Integrate maintenance plans directly into your work orders in MaintainX.

3 Yearly Evaporator Maintenance

Check mark

Clean evaporator

Check mark

Is the evaporator part of a closed circuit?

Check mark

If yes, proceed to step 4. If no, proceed to step 5.

Check mark

Has it been three years since the last cleaning?

Check mark

For open evaporator systems, such as air washers, periodic inspection and cleaning is recommended.

Check mark

Has the evaporator been inspected recently?

Check mark

Has the evaporator been cleaned recently?

Check mark

Sign off on the evaporator maintenance

Run this procedureArrow right

3 Monthly Chiller Maintenance

Check mark

Clean all water strainers in the water piping system

Check mark

Inspect waterbox coatings within the first 1–3 months to determine a required maintenance schedule for your job site

Check mark

Inspect waterbox anodes within the first 1–3 months to determine a required maintenance schedule for your job site

Check mark

Sign off on the chiller maintenance

Run this procedureArrow right

1 Daily Chiller Maintenance

Check mark

Chiller's evaporator pressure

Check mark

Chiller's condenser pressure

Check mark

Oil tank pressure

Check mark

Differential oil pressure

Check mark

Discharge oil pressure

Check mark

Compare the readings with the values provided in the general maintenance

Check mark

Check the oil level in the chiller oil sump using the two sight glasses provided in the oil sump head. When the unit is operating, the oil level should be visible in the lower sight glass

Check mark

Complete logs on a daily basis

Run this procedureArrow right

General Chiller Maintenance

Check mark

WARNING: Hazardous Voltage w/Capacitors!

Check mark

Failure to disconnect power and discharge capacitors before servicing could result in death or serious injury.

Check mark

Disconnect all electric power, including remote disconnects and discharge all motor start/run capacitors before servicing.

Check mark

Follow proper lockout/tagout procedures to ensure the power cannot be inadvertently energized.

Check mark

NOTICE: Check Purge Run-Time for Unit Hermetic Integrity!

Check mark

Failure to follow instructions below could result in chiller damage.

Check mark

If frequent purging is required, monitor purge pumpout rate, and identify and correct source of air or water leak as soon as possible to prevent moisture contamination caused by leakage.

Check mark

NOTICE: Do Not Use Non-Compatible Parts or Materials!

Check mark

Use of non-compatible parts or materials could result in equipment damage.

Run this procedureArrow right

1 Yearly Control Circuits Inspection

Check mark

Shut down the chiller

Check mark

Verify control parameters

Check mark

Test appropriate sensors for accuracy

Check mark

Ensure sensors are properly seated in wells with thermopaste installed

Check mark

Check evaporator leaving water temperature low temperature cutout setpoint

Check mark

Condenser high pressure switch check-out

Check mark

Check adjustment and operation of the inlet guide vane actuator

Check mark

Sign off on the control circuits inspection

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 050S / 080S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets