The Trane CenTraVac™ Water-Cooled Chiller CVHF - 190-320 - 231 - 050S / 050S is a high-efficiency industrial cooling solution designed for large-scale applications. Known for its reliability and performance, this chiller optimizes energy use while providing consistent temperature control in commercial settings.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 190-320 - 231 - 050S / 050S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Control Circuits Inspection
Shut down the chiller
Verify control parameters
Test appropriate sensors for accuracy
Ensure sensors are properly seated in wells with thermopaste installed
Check evaporator leaving water temperature low temperature cutout setpoint
Condenser high pressure switch check-out
Check adjustment and operation of the inlet guide vane actuator
Sign off on the control circuits inspection
1 Yearly Compressor/Motor Inspection
- Shut down the chiller once each year to check the items
- Compressor/Motor p.103:
1. Motor continuity
2. Motor meg test
3. Check motor terminals
4. Inspect motor terminal board
5. Check inlet guide vanes (IGV) for abnormalities;
1 Yearly Purge Unit Inspection
Shut down the chiller
Review the purge Installation, Operation, and Maintenance manual and follow maintenance and/or inspection items identified
Review purge pump-out data
Review overall operation of purge and service as necessary
Sign off on the purge unit inspection
1 Yearly Condenser Inspection
- Shut down the chiller once each year to check the items of Condenser
1. Inspect for fouling and scaling in tubes
2. Check operation of condenser water flow sensing device
3. Factory recommendation to eddy current test tubes every three years;
Initial 1000 Hours/6 Months Chiller Oil Replacement
NOTICE: Equipment Damage! Mixing refrigerants or oils could result in equipment damage including bearing damage, introduction of acids into the chiller, or continuous purge pump-out in high-head/high ambient applications.
CenTraVac chillers are manufactured with different refrigerant/oil systems: 1) chillers using R-123 refrigerant and OIL00022 compressor oil, and 2) chillers using R-514A refrigerant and OIL00334/OIL00335 compressor oil.
Verify proper refrigerant and oil for your chiller and do NOT mix refrigerants or oils!
Important: Verify proper refrigerant and compressor oil for your chiller before proceeding!
After the first six months of accumulated operation or after 1000 hours operation—whichever comes first—it is recommended to change the oil and filter.
After this oil change, it is recommended to subscribe to the Trane annual oil analysis program rather than automatically change the oil as part of scheduled maintenance.
Change the oil only if indicated by the oil analysis. Using an oil analysis program will reduce the chiller’s overall lifetime waste oil generation and minimize refrigerant emissions.
The analysis determines system moisture content, acid level, and wear metal content of the oil, and can be used as a diagnostic tool. The oil analysis should be performed by a qualified laboratory that is experienced in refrigerant and oil chemistry and in the servicing of Trane® centrifugal chillers.
In conjunction with other diagnostics performed by a qualified service technician, oil analyses can provide valuable information on the performance of the chiller to help minimize operating and maintenance costs and maximize its operating life. A valve is installed next to the oil filter for the purpose of obtaining oil samples.
Access the parts list for your equipment in MaintainX.
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













