Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Trane CenTraVac™ Water-Cooled Chiller CVHF - 190-320 - 215 - 050S / 050L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Chiller Lubrication
Lubricate the vane control linkage bearings, ball joints, and pivot points
Lubricate vane operator tang O- rings
Lubricate the oil filter shutoff valve O-rings
Sign off on the chiller lubrication
1 Yearly Purge Unit Inspection
Shut down the chiller
Review the purge Installation, Operation, and Maintenance manual and follow maintenance and/or inspection items identified
Review purge pump-out data
Review overall operation of purge and service as necessary
Sign off on the purge unit inspection
1 Yearly Starter/Adaptive Frequency Drive Inspection
Shut down the chiller once each year to check the items of Starter or Adaptive FrequencyTM Drive
Inspect starter contacts
Check all connections per manufacturer specifications
Follow all manufacturer recommendations for starter or Adaptive FrequencyTM Drive (AFD) maintenance
Inspect/clean/service the AFD cooling system (water- or air-cooled AFD)
Record all applicable starter or starter component settings
1 Yearly Chiller Lubrication
Lubricate the gantries annually
Choose the lubricant for gantries
Lubricate the hinges annually
Choose the lubricant for hinges
Sign off on the chiller lubrication
1 Yearly Optional Accessories Maintenance
Shut down the chiller once each year to check the items of Optional Accessories
If applicable, lubricate factory-installed gantries
After the first month of operation, inspect Heresite® or Belzona® coated waterboxes; thereafter, inspect as needed
Inspect anodes
Inspect and lubricate hinged waterboxes
With water flow sensing option, bleed tubing from waterboxes to transformers
Sign off on the yearly optional accessories maintenance
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX