Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Trane CenTraVac™ Water-Cooled Chiller CVHF - 190-320 - 215 - 032S / 032S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Evaporator Inspection
- Shut down the chiller once each year to check the items of Evaporator
1. Inspect for fouling and scaling in tubes
2. Check operation of evaporator water flow sensing device
3. Factory recommendation to eddy current test tubes every three years;
1 Yearly Condenser Cleaning
NOTICE: Proper Water Treatment Required! The use of untreated or improperly treated water could result in scaling, erosion, corrosion, algae or slime. Use the services of a qualified water treatment specialist to determine what water treatment, if any, is required. Trane assumes no responsibility for equipment failures which result from untreated or improperly treated water, or saline or brackish water.
Condenser tube fouling is indicated when the approach temperature (the difference between the condensing refrigerant temperature and the leaving condenser water temperature) is higher than predicted.
If the annual condenser tube inspection indicates that the tubes are fouled, two cleaning methods— mechanical and chemical—can be used to rid the tubes of contaminants. Use the mechanical cleaning method to remove sludge and loose material from smooth-bore tubes.
To clean other types of tubes including internally- enhanced types, consult a qualified service organization for recommendations.
Follow all instructions in “Waterbox Removal and Installation,” to remove waterbox covers.
Work a round nylon or brass bristled brush (attached to a rod) in and out of each of the condenser water tubes to loosen the sludge.
Thoroughly flush the condenser water tubes with clean water.
Scale deposits are best removed by chemical means. Be sure to consult any qualified chemical house in the area (one familiar with the local water supply’s chemical mineral content) for a recommended cleaning solution suitable for the job.
NOTICE: Unit Corrosion Damage! Failure to follow instructions below could result in corrosion damage to the unit and tubes. Follow proper procedures when using corrosive chemicals to clean water side of unit. If unsure, it is recommended that the services of a qualified chemical cleaning firm be used.
General Chiller Maintenance
Check chiller for normal operation
Condenser pressure
Normal pressure readings for ASME condenser
Oil tank pressure
Discharge oil pressure
Approximate Evaporator Pressure
Approximate Condenser Pressure(a)
Approximate Condenser Pressure(b)
Oil Sump Temperature Unit not running
1 Yearly Chiller Leak Test
WARNING: Explosion Hazard! Never use an open flame to detect gas leaks. Use a leak test solution for leak testing.
WARNING: Hazardous Pressures! If a heat source is required to raise the tank pressure during removal of refrigerant from cylinders, use only warm water or heat blankets to raise the tank temperature. Do not exceed a temperature of 150°F. Do not under any circumstances apply direct flame to any portion of the cylinder.
Important: If leak testing is required, contact a Trane Service Agency.
Shut down the chiller
Check purge times and unit performance logs
Review oil analysis
Submit refrigerant sample for analysis if required
Inspect unit for any signs of refrigerant or oil leakage
Check unit for any loose screws on flange, volutes, or casing
1 Yearly Purge Unit Inspection
Shut down the chiller
Review the purge Installation, Operation, and Maintenance manual and follow maintenance and/or inspection items identified
Review purge pump-out data
Review overall operation of purge and service as necessary
Sign off on the purge unit inspection
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX