Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 190-320 - 215 - 032S / 032L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Chiller Maintenance
Contact a qualified service organization to determine when to conduct a complete examination of the unit to discern the condition of the compressor and internal components
Check for chronic air leaks
Check for evaporator water tube leaks
Check for condenser water tube leaks
Sign off on the yearly chiller maintenance
1 Yearly Purge Unit Inspection
Shut down the chiller
Upload the purge Installation, Operation, and Maintenance manual
Follow maintenance and/or inspection items identified in the manual
Enter purge pump-out data
Review overall operation of purge
Service as necessary
Sign off on the purge unit inspection
1 Yearly Optional Accessories Maintenance
Shut down the chiller once each year to check the items of Optional Accessories
If applicable, lubricate factory-installed gantries
After the first month of operation, inspect Heresite® or Belzona® coated waterboxes; thereafter, inspect as needed
Inspect anodes
Inspect and lubricate hinged waterboxes
With water flow sensing option, bleed tubing from waterboxes to transformers
Sign off on the yearly optional accessories maintenance
1 Yearly Oil System Inspection
Shut down the chiller
Perform Annual oil analysis (follow recommendations)
Clean and lubricate oil system as required
Electrical inspection
Pump motor continuity check
Run oil pump and check differential oil pressure
Sign off on the oil system inspection
1 Yearly Compressor/Motor Inspection
- Shut down the chiller once each year to check the items
- Compressor/Motor p.103:
1. Motor continuity
2. Motor meg test
3. Check motor terminals
4. Inspect motor terminal board
5. Check inlet guide vanes (IGV) for abnormalities;
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













