MaintainX Logo
EnterprisePricing
Trane

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 142L / 210L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 142L / 210L
Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 142L / 210L

The Trane CenTraVac™ Water-Cooled Chiller CVHF, model 1070-1300, is designed for high-efficiency cooling in industrial applications. This robust chiller offers reliable performance and advanced technology, ensuring optimal energy use and system longevity. Ideal for large facilities, it supports various cooling needs while maintaining low operational costs.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 142L / 210L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 142L / 210L

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 142L / 210L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 1070-1300 - 1062 - 142L / 210L

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Chiller Maintenance

Check mark

- Check the chiller’s evaporator and condenser pressures, oil tank pressure, differential oil pressure, and discharge oil pressure

Check mark

- Compare the readings with the values provided in the general maintenance

Check mark

- Check the oil level in the chiller oil sump using the two sight glasses provided in the oil sump head. When the unit is operating, the oil level should be visible in the lower sight glass

Check mark

- Complete logs on a daily basis.

Run this procedureArrow right

3 Yearly Evaporator Maintenance

Check mark

- Clean evaporator

Check mark

1. Since the evaporator is typically part of a closed circuit, it may not accumulate appreciable amounts of scale or sludge

Check mark

2. Normally, cleaning every three years is sufficient

Check mark

3. However, periodic inspection and cleaning is recommended on open evaporator systems, such as air washers;

Run this procedureArrow right

1 Yearly Chiller Leak Test

Check mark

- Shut down the chiller once each year to check the items for Leak Test Chiller

Check mark

1. Check purge times and unit performance logs. If warranted, pressure leak test

Check mark

2. Review oil analysis. If required, submit refrigerant sample for analysis

Check mark

3. Inspect unit for any signs of refrigerant or oil leakage

Check mark

4. Check unit for any loose screws on flange, volutes, or casing

Check mark

WARNING

Check mark

Explosion Hazard!

Check mark

Failure to follow safe leak test procedures below could result in death or serious injury or equipment or property-only-damage

Check mark

Never use an open flame to detect gas leaks. Use a leak test solution for leak testing

Run this procedureArrow right

1 Yearly Exterior Parts Maintenance

Check mark

- Shut down the chiller once each year to check the items of Exterior

Check mark

1. Inlet guide vane linkage

Check mark

2. Clean and touch-up painted surfaces as needed

Check mark

3. Repair deteriorated, torn, or missing insulation;

Run this procedureArrow right

Initial 1000 Hours/6 Monthly Chiller Oil Replacement

Check mark

- Change compressor oil

Check mark

NOTICE:

Check mark

Equipment Damage! Mixing refrigerants or oils could result in equipment damage including bearing damage, introduction of acids into the chiller, or continuous purge pump-out in high-head/high ambient applications

Check mark

CenTraVac chillers are manufactured with different refrigerant/oil systems: 1) chillers using R-123 refrigerant and OIL00022 compressor oil, and 2) chillers using R-514A refrigerant and OIL00334/OIL00335 compressor oil

Check mark

Verify proper refrigerant and oil for your chiller and do NOT mix refrigerants or oils!

Check mark

Important: Verify proper refrigerant and compressor oil for your chiller before proceeding!

Check mark

1. After the first six months of accumulated operation or after 1000 hours operation—whichever comes first—it is recommended to change the oil and filter

Check mark

2. After this oil change, it is recommended to subscribe to the Trane annual oil analysis program rather than automatically change the oil as part of scheduled maintenance

Check mark

3. Change the oil only if indicated by the oil analysis. Using an oil analysis program will reduce the chiller’s overall lifetime waste oil generation and minimize refrigerant emissions. The analysis determines system moisture content, acid level, and wear metal content of the oil, and can be used as a diagnostic tool. The oil analysis should be performed by a qualified laboratory that is experienced in refrigerant and oil chemistry and in the servicing of Trane® centrifugal chillers

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 142L / 210L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets