The Trane CenTraVac™ Water-Cooled Chiller CVHF model 1070-1300 is designed for high-efficiency cooling in industrial applications. This robust chiller offers reliable performance and advanced features, ensuring optimal temperature control and energy savings for large facilities.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 080L / 142L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 080L / 142L

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 080L / 142L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 1070-1300 - 1062 - 080L / 142L

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Purge Unit Inspection

Check mark

- Shut down the chiller once each year to check the items of Purge Unit

Check mark

1. Review the purge Installation, Operation, and Maintenance manual and follow maintenance and/or inspection items identified

Check mark

2. Review purge pump-out data

Check mark

3. Review overall operation of purge and service as necessary;

Run this procedureArrow right

General Chiller Maintenance

Check mark

- Check chiller for normal operation

Check mark

1. Condenser pressure is dependent on condenser water temperature, and should equal the saturation pressure of the refrigerant at a temperature above that of leaving condenser water at full load

Check mark

2. Normal pressure readings for ASME condenser exceed 12 psig (82.7 kPaG)

Check mark

3. Oil tank pressure: -9 to -6 psig (-62.1 to -41.4 kPaG). Discharge oil pressure: 7 to 15 psig (48.3 to 103.4 KPaG)

Check mark

4. Approximate Evaporator Pressure: 6 to 9 psia (41.4 to 62.1 kPaA) / -9 to -6 psig (-62.1 to -41.4 kPaG)

Check mark

5. Approximate Condenser: Pressure(a) , (b) 17 to 27 psia (117.2 to 182.2 kPaA) / 2 to 12 psig (13.8 to 82.7 kPaG) (standard condenser)

Check mark

6. Oil Sump Temperature Unit not running: 140°F to 176°F (60.0°C to 80.0°C)

Check mark

7. Oil Sump Temperature Unit running: 95°F to 162ºF (35.0°C to 72.2°C)

Check mark

8. Oil Sump Differential: Oil Pressure(c) 18 to 22 psid (124.1 to 151.7 PaD)

Run this procedureArrow right

6 Monthly Chiller Maintenance

Check mark

- Operate the tang operators manually and check for any abnormalities

Check mark

- Drain contents of the rupture disk and purge discharge vent-line drip-leg into an evacuated waste container

Check mark

- Do this more often if the purge is operated excessively

Check mark

- Apply oil to any exposed metal parts to prevent rust;

Run this procedureArrow right

2 Monthly Sacrificial Anodes Replacement

Check mark

- The replacement schedule for the optional zinc or magnesium anodes can vary greatly with the aggressiveness of the water that is in the system

Check mark

- Some sites could require anode replacement every two to three months while other sites may require anode replacement every two to three years

Check mark

1. Trane recommends inspection of anodes for wear sometime within the first several months of the anodes being placed into service

Check mark

2. If the observed loss of anode material is small, then the interval between subsequent inspections can be lengthened

Check mark

3. Replace the anode and/ or shorten the inspection interval if the anode has lost 50 percent or more of its original mass

Check mark

4. If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application

Check mark

NOTICE

Check mark

Equipment Damage!

Check mark

Failure to follow instructions could result in equipment damage

Run this procedureArrow right

Initial 1000 Hours/6 Monthly Chiller Oil Replacement

Check mark

- Change compressor oil

Check mark

NOTICE:

Check mark

Equipment Damage! Mixing refrigerants or oils could result in equipment damage including bearing damage, introduction of acids into the chiller, or continuous purge pump-out in high-head/high ambient applications

Check mark

CenTraVac chillers are manufactured with different refrigerant/oil systems: 1) chillers using R-123 refrigerant and OIL00022 compressor oil, and 2) chillers using R-514A refrigerant and OIL00334/OIL00335 compressor oil

Check mark

Verify proper refrigerant and oil for your chiller and do NOT mix refrigerants or oils!

Check mark

Important: Verify proper refrigerant and compressor oil for your chiller before proceeding!

Check mark

1. After the first six months of accumulated operation or after 1000 hours operation—whichever comes first—it is recommended to change the oil and filter

Check mark

2. After this oil change, it is recommended to subscribe to the Trane annual oil analysis program rather than automatically change the oil as part of scheduled maintenance

Check mark

3. Change the oil only if indicated by the oil analysis. Using an oil analysis program will reduce the chiller’s overall lifetime waste oil generation and minimize refrigerant emissions. The analysis determines system moisture content, acid level, and wear metal content of the oil, and can be used as a diagnostic tool. The oil analysis should be performed by a qualified laboratory that is experienced in refrigerant and oil chemistry and in the servicing of Trane® centrifugal chillers

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 080L / 142L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets