Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050S / 050L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050S / 050L
Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050S / 050L

The Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050S / 050L is a high-efficiency cooling solution designed for industrial applications. Known for its reliability and advanced technology, this chiller optimizes energy use while providing superior temperature control. Ideal for large facilities, it ensures consistent performance and longevity.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050S / 050L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050S / 050L

Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050S / 050L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHE - 360-500 - 455 - 050S / 050L

Integrate maintenance plans directly into your work orders in MaintainX.

2 Monthly Sacrificial Anodes Replacement

Check mark

Warning: Equipment Damage! Failure to follow instructions could result in equipment damage

Check mark

Do NOT use Teflon-based tape or paste on anode; a small amount of liquid sealant (Loctite® 242 or equivalent) may be applied to prevent leakage when installing an anode, but do not apply so much sealant that it prevents the necessary electrical connection between the anode and the waterbox

Check mark

Inspection of anodes for wear within the first several months of the anodes being placed into service

Check mark

Enter the observed loss of anode material

Check mark

Anode has lost 50 percent or more of its original mass

Check mark

If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application

Check mark

Upload a photo of the anode after inspection

Check mark

Enter the type of sealant used

Check mark

Enter the size of the wrench used to remove/install Trane-supplied waterbox anodes

Run this procedureArrow right

3 Monthly Chiller Maintenance

Check mark

Clean all water strainers in the water piping system

Check mark

Inspect waterbox coatings within the first 1–3 months to determine a required maintenance schedule for your job site

Check mark

Inspect waterbox anodes within the first 1–3 months to determine a required maintenance schedule for your job site

Check mark

Sign off on the chiller maintenance

Run this procedureArrow right

Initial 1 Month Waterbox Maintenance

Check mark

Trane recommends that coated waterboxes/tubesheets - regardless of the type of protective coating included - be taken out of service within the first one to three months of operation for inspection.

Check mark

Any voids or defects identified upon inspection?

Check mark

If voids or defects are identified, they must be repaired.

Check mark

Is the water quality known to be highly supportive of corrosion (i.e., sea water, etc.)?

Check mark

If yes, inspect the coating system at one month.

Check mark

Is the water quality known to be relatively benign (i.e., normal treated and clean condenser water)?

Check mark

If yes, inspect the coating system within three months.

Check mark

Did the initial inspections show no problems?

Check mark

Only when initial inspections show no problems are present should subsequent maintenance intervals be increased.

Run this procedureArrow right

1 Yearly Condenser Inspection

Check mark

Shut down the chiller

Check mark

Inspect for fouling and scaling in tubes

Check mark

Check operation of condenser water flow sensing device

Check mark

Factory recommendation to eddy current test tubes every three years

Check mark

Sign off on the condenser inspection

Run this procedureArrow right

1 Yearly Evaporator Inspection

Check mark

Shut down the chiller

Check mark

Inspect for fouling and scaling in tubes

Check mark

Check operation of evaporator water flow sensing device

Check mark

Factory recommendation to eddy current test tubes every three years

Check mark

Sign off on the evaporator inspection

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050S / 050L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets