Trane

Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050L / 080L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050L / 080L
Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050L / 080L

The Trane CenTraVac™ Water-Cooled Chiller CVHE is a high-efficiency cooling solution designed for large commercial applications. With models ranging from 360 to 500 tons, it delivers reliable performance and energy savings, making it an ideal choice for modern HVAC systems.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050L / 080L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050L / 080L

Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050L / 080L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHE - 360-500 - 455 - 050L / 080L

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Chiller Maintenance

Check mark

- For R-123 chillers, perform the annual maintenance procedures referred to in Operation and Maintenance Guide: EarthWise Purge System with Tracer AdaptiView Control for Water-Cooled CenTraVac Chillers with R-123 Refrigerant (PRGF- SVX01*-EN). For R-514A chillers, perform the annual maintenance procedures referred to in Operation and Maintenance Guide: Purge System with Tracer AdaptiView Control for Water-Cooled CenTraVac Chillers with R-514A Refrigerant (PRGG-SVX001*-EN)

Check mark

- Use an ice water bath to verify the accuracy of the evaporator refrigerant temperature sensor (4R10). If the sensor is exposed to temperature extremes outside its normal operating range (0°F to 90°F [-17.8°C to 32.2°C]), check its accuracy at six-month intervals

Check mark

- Inspect the condenser tubes for fouling; clean if necessary

Check mark

- Inspect and clean the ifm efector® flow detection sensors. Use Scotch-Brite® or other non-abrasive material to clean scale; do NOT use steel wool, which could cause the probe to rust

Check mark

- Submit a sample of the compressor oil to a Trane- qualified laboratory for comprehensive analysis

Check mark

- Measure the compressor motor winding resistance to ground; a qualified service technician should conduct this check to ensure that the findings are properly interpreted. Contact a qualified service organization to leak-test the chiller; this procedure is especially important if the system requires frequent purging;

Run this procedureArrow right

6 Monthly Chiller Lubrication

Check mark

- Lubricate the vane control linkage bearings, ball joints, and pivot points

Check mark

- Lubricate vane operator tang O- rings

Check mark

- Lubricate the oil filter shutoff valve O-rings;

Run this procedureArrow right

1 Yearly Condenser Inspection

Check mark

- Shut down the chiller once each year to check the items of Condenser

Check mark

1. Inspect for fouling and scaling in tubes

Check mark

2. Check operation of condenser water flow sensing device

Check mark

3. Factory recommendation to eddy current test tubes every three years;

Run this procedureArrow right

1 Yearly Evaporator Inspection

Check mark

- Shut down the chiller once each year to check the items of Evaporator

Check mark

1. Inspect for fouling and scaling in tubes

Check mark

2. Check operation of evaporator water flow sensing device

Check mark

3. Factory recommendation to eddy current test tubes every three years;

Run this procedureArrow right

3 Yearly Tubes Maintenance

Check mark

- Use a non-destructive tube test to inspect the condenser and evaporator tubes

Check mark

1. It may be desirable to perform tube tests on these components at more frequent intervals depending upon chiller application

Check mark

2. This is especially true of critical process equipment

Check mark

3. Ask your Sales account manager for a copy of engineering bulletin (CTV-PRB024*-EN) for clarification of the role of eddy current testing in chiller maintenance by providing information about eddy current technology and heat exchanger tubing;

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050L / 080L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets