The Trane CenTraVac™ Water-Cooled Chiller CVHE is a high-efficiency cooling solution designed for large commercial applications. With models ranging from 360 to 500 tons, it delivers reliable performance and energy savings, making it an ideal choice for modern HVAC systems.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHE - 360-500 - 455 - 050L / 080L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Chiller Maintenance
- For R-123 chillers, perform the annual maintenance procedures referred to in Operation and Maintenance Guide: EarthWise Purge System with Tracer AdaptiView Control for Water-Cooled CenTraVac Chillers with R-123 Refrigerant (PRGF- SVX01*-EN). For R-514A chillers, perform the annual maintenance procedures referred to in Operation and Maintenance Guide: Purge System with Tracer AdaptiView Control for Water-Cooled CenTraVac Chillers with R-514A Refrigerant (PRGG-SVX001*-EN)
- Use an ice water bath to verify the accuracy of the evaporator refrigerant temperature sensor (4R10). If the sensor is exposed to temperature extremes outside its normal operating range (0°F to 90°F [-17.8°C to 32.2°C]), check its accuracy at six-month intervals
- Inspect the condenser tubes for fouling; clean if necessary
- Inspect and clean the ifm efector® flow detection sensors. Use Scotch-Brite® or other non-abrasive material to clean scale; do NOT use steel wool, which could cause the probe to rust
- Submit a sample of the compressor oil to a Trane- qualified laboratory for comprehensive analysis
- Measure the compressor motor winding resistance to ground; a qualified service technician should conduct this check to ensure that the findings are properly interpreted. Contact a qualified service organization to leak-test the chiller; this procedure is especially important if the system requires frequent purging;
6 Monthly Chiller Lubrication
- Lubricate the vane control linkage bearings, ball joints, and pivot points
- Lubricate vane operator tang O- rings
- Lubricate the oil filter shutoff valve O-rings;
1 Yearly Condenser Inspection
- Shut down the chiller once each year to check the items of Condenser
1. Inspect for fouling and scaling in tubes
2. Check operation of condenser water flow sensing device
3. Factory recommendation to eddy current test tubes every three years;
1 Yearly Evaporator Inspection
- Shut down the chiller once each year to check the items of Evaporator
1. Inspect for fouling and scaling in tubes
2. Check operation of evaporator water flow sensing device
3. Factory recommendation to eddy current test tubes every three years;
3 Yearly Tubes Maintenance
- Use a non-destructive tube test to inspect the condenser and evaporator tubes
1. It may be desirable to perform tube tests on these components at more frequent intervals depending upon chiller application
2. This is especially true of critical process equipment
3. Ask your Sales account manager for a copy of engineering bulletin (CTV-PRB024*-EN) for clarification of the role of eddy current testing in chiller maintenance by providing information about eddy current technology and heat exchanger tubing;
Access the parts list for your equipment in MaintainX.
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX