The Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 080S is a high-efficiency industrial chiller designed for optimal cooling performance. Ideal for large facilities, it offers advanced features and reliable operation, ensuring energy savings and reduced environmental impact.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 350-910 - 957 - 080S / 080S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Chiller Maintenance
- Check the chiller’s evaporator and condenser pressures, oil tank pressure, differential oil pressure, and discharge oil pressure
- Compare the readings with the values provided in the general maintenance
- Check the oil level in the chiller oil sump using the two sight glasses provided in the oil sump head. When the unit is operating, the oil level should be visible in the lower sight glass
- Complete logs on a daily basis.
1 Yearly Chiller Leak Test
- Shut down the chiller once each year to check the items for Leak Test Chiller
1. Check purge times and unit performance logs. If warranted, pressure leak test
2. Review oil analysis. If required, submit refrigerant sample for analysis
3. Inspect unit for any signs of refrigerant or oil leakage
4. Check unit for any loose screws on flange, volutes, or casing
WARNING
Explosion Hazard!
Failure to follow safe leak test procedures below could result in death or serious injury or equipment or property-only-damage
Never use an open flame to detect gas leaks. Use a leak test solution for leak testing
1 Yearly Chiller Lubrication
- Lubricate the gantries annually
1. Use ConocoPhillips Gantries MegaPlex® XD3 (gray in color), LPS® MultiPlex Multi-Purpose (blue in color), or equivalent
- Lubricate the hinges annually
1. Use ConocoPhillips MegaPlex® XD3 (gray in color), LPS® MultiPlex Multi- Purpose (blue in color), or equivalent;
1 Yearly Chiller Maintenance
- Contact a qualified service organization to determine when to conduct a complete examination of the unit to discern the condition of the compressor and internal components
1. Check the following: chronic air leaks (which can cause acidic conditions in the compressor oil and result in premature bearing wear) 2. Check evaporator water tube leaks (water mixed with the compressor oil can result in bearing pitting, corrosion, or excessive wear)
3. Check condenser water tube leaks (water mixed with the compressor oil can result in bearing pitting, corrosion, or excessive wear);
1 Yearly Chiller Maintenance
- For R-123 chillers, perform the annual maintenance procedures referred to in Operation and Maintenance Guide: EarthWise Purge System with Tracer AdaptiView Control for Water-Cooled CenTraVac Chillers with R-123 Refrigerant (PRGF- SVX01*-EN). For R-514A chillers, perform the annual maintenance procedures referred to in Operation and Maintenance Guide: Purge System with Tracer AdaptiView Control for Water-Cooled CenTraVac Chillers with R-514A Refrigerant (PRGG-SVX001*-EN)
- Use an ice water bath to verify the accuracy of the evaporator refrigerant temperature sensor (4R10). If the sensor is exposed to temperature extremes outside its normal operating range (0°F to 90°F [-17.8°C to 32.2°C]), check its accuracy at six-month intervals
- Inspect the condenser tubes for fouling; clean if necessary
- Inspect and clean the ifm efector® flow detection sensors. Use Scotch-Brite® or other non-abrasive material to clean scale; do NOT use steel wool, which could cause the probe to rust
- Submit a sample of the compressor oil to a Trane- qualified laboratory for comprehensive analysis
- Measure the compressor motor winding resistance to ground; a qualified service technician should conduct this check to ensure that the findings are properly interpreted. Contact a qualified service organization to leak-test the chiller; this procedure is especially important if the system requires frequent purging;
Access the parts list for your equipment in MaintainX.
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX