The Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 289 - 032S / 032L is a high-efficiency cooling solution designed for industrial applications. Known for its reliability and performance, this chiller offers advanced features to ensure optimal operation and energy savings. Ideal for large facilities, it supports various cooling needs effectively.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 289 - 032S / 032L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Chiller Maintenance
Chiller's evaporator pressure
Chiller's condenser pressure
Oil tank pressure
Differential oil pressure
Discharge oil pressure
Compare the readings with the values provided in the general maintenance
Check the oil level in the chiller oil sump using the two sight glasses provided in the oil sump head. When the unit is operating, the oil level should be visible in the lower sight glass
Complete logs on a daily basis
Sign off on the daily chiller maintenance
1 Yearly Condenser Inspection
Shut down the chiller
Inspect for fouling and scaling in tubes
Check operation of condenser water flow sensing device
Factory recommendation to eddy current test tubes every three years
Sign off on the condenser inspection
1 Yearly Exterior Parts Maintenance
Chiller shut down?
Inlet guide vane linkage checked?
Painted surfaces cleaned and touched-up as needed?
Deteriorated, torn, or missing insulation repaired?
1 Yearly Chiller Maintenance
Contact a qualified service organization to determine when to conduct a complete examination of the unit to discern the condition of the compressor and internal components
Check for chronic air leaks
Check for evaporator water tube leaks
Check for condenser water tube leaks
Sign off on the yearly chiller maintenance
1 Yearly Oil System Inspection
Shut down the chiller
Perform Annual oil analysis (follow recommendations)
Clean and lubricate oil system as required
Electrical inspection
Pump motor continuity check
Run oil pump and check differential oil pressure
Sign off on the yearly oil system inspection
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













