Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Toyota Forklift 30-5FBCH25
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
170 Hour / 1 Month Braking System Maintenance
Measure brake pedal play and reserve
Inspect braking effect in brake pedal
Inspect pull margin, braking effect, rod and cable looseness and damage of the parking brake
Inspect leak, damage and mounting condition of the brake pipe
Inspect brake fluid for leak and fluid level
Measure clearance between drum and lining
Sign off on the brake system maintenance
2000 Hour / 12 Month Braking System Maintenance
Inspect parking brake for ratchet wear and damage
Inspect function, wear, damage, leak and mounting looseness in Master cylinder and wheel cylinder
Inspect wear of shoe sliding portion and lining
Inspect drum wear and damage
Inspect shoe operating condition
Inspect anchor pin rusting
Measure return spring fatigue
Inspect automatic adjuster function
Inspect backing plate for deformation, cracks and damage
2000 Hour / 12 Month Steering System Maintenance
Inspect damage of power steering hose
Inspect cracks and deformation in knuckle
Measure wheel alignment
Measure left turning angle
Measure right turning angle
Sign off on the steering system maintenance
2 Year Replacement
Power steering hoses replaced
Internal rubbers parts of power steering system replaced
Reserve tank hose replaced
Material handling hose replaced
Note: Replace chain every 3 years
Sign off on the 2 Year Replacement
2000 Hour / 12 Month Material Handling System Inspection
Inspect cracks at fork root and welded part while forklift is new
Inspect wear and damage of mast support bushing
Inspect wear and damage of roller pins
Sign off on the inspection
Access the parts list for your equipment in MaintainX.
Universal Joint Flange Holding Tool
09330-30010
Rear Wheel Bearlng Nut Wrench
09509-55020
Front Hub & Drive Pinion Bearing Tool Set
09608-30012
Axle Hub & Drive Pinion Bearing Tool Set
09608-35014
Steering Wheel Puller
09609-20011
Universal Joint Flange Holding Tool
09330-30010
Rear Wheel Bearlng Nut Wrench
09509-55020
Front Hub & Drive Pinion Bearing Tool Set
09608-30012
Axle Hub & Drive Pinion Bearing Tool Set
09608-35014
Steering Wheel Puller
09609-20011
Universal Joint Flange Holding Tool
09330-30010
Rear Wheel Bearlng Nut Wrench
09509-55020
Front Hub & Drive Pinion Bearing Tool Set
09608-30012
Axle Hub & Drive Pinion Bearing Tool Set
09608-35014
Steering Wheel Puller
09609-20011
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX