The Sullair Industrial Rotary Screw Air Compressor TS32SC-500/600WCAC is designed for high-efficiency air compression in industrial applications. Known for its reliability and performance, this model ensures optimal operation with minimal downtime, making it an essential asset for any manufacturing facility.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

SULLAIR Industrial Rotary Screw Air Compressor TS32SC-500/600WCAC
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1000 Hourly Fluid Sampling
NOTE! A fluid sample at every 1000 hours is recommended
1. For a free Sullube analysis, send fluid to
1.1 Dow Chemical
1.2 Lubricant Technology Center
1.3 Building B-1605
1.4 Freeport, TX 77541
2. To facilitate this, a sample bottle is included with the compressor;
1000 Hourly Industrial Rotary Screw Air Compressor Maintenance
Clean the return line strainers
Lubricate the Sullicon Control linkage
Replace the fluid filter element
Sign off on the maintenance completion
1 Daily Industrial Rotary Screw Air Compressor Service
WARNING! DO NOT remove caps, plugs, and/or other components when compressor is running or pressurized. Stop compressor and relieve all internal pressure before doing so
Check the fluid level in the sump
Observe the Supervisor control panel and be sure it monitors the correct readings for that particular phase of operation
After the compressor has warmed up, it is recommended that a general check of the overall compressor and Supervisor be made to assure that the compressor is running properly
Sign off on the daily industrial rotary screw air compressor service
1 Yearly Drive Coupling Maintenance
WARNING! Disconnect all power at source before attempting maintenance or adjustments
Check alignment per Step 3. If operation limits from Table 7-1 Installation Data are exceeded, realign coupling to installation limits
Check outer blades of discpacks near bushings for fatigue cracks. Discpacks can be checked while coupling is in operation by using a strobe light. Replace cracked discpacks and recheck alignment. A slight bowing or āSā-like distortion is normal
Check tightening torques of all drive bolts
STEP 1- HUB INSTALLATION. MOTOR HUB INSTALLATION FOR MOTOR HUB MOUNTING
Coupling is furnished for an interference fit with a set screw. Heat hub to 275oF (135oC) using an oven, torch, induction heater or an oil bath
When an oxy-acetylene or blow torch is used, use an excess acetylene mixture. Mark hubs near the center of their length in several places on hub body with a temperature sensitive crayon, 275oF (135oC) melt temperature. Direct flame towards hub bore using constant motion to avoid overheating an area
Heat hubs as instructed above. Mount hubs as quickly as possible with hub flange face flush with shaft end. Allow hubs to cool before proceeding. Insert set screws (if required) and tighten
COMPRESSOR HUB INSTALLATION
1 Yearly Separator Element Replacement
NOTE! DO NOT clean the separator elements
Is a replacement message displayed?
Date of last replacement
Has it been one year since the last replacement?
Were the separator elements replaced?
Sign off on the separator element replacement
Access the parts list for your equipment in MaintainX.
2-1/2ā Sae Check Valve Insert
02250125-617
240A It Starter
02250122-042
24Kt Fluid
02250051-153
304A It Starter
02250120-789
360A It Starter
02250120-792
2-1/2ā Sae Check Valve Insert
02250125-617
240A It Starter
02250122-042
24Kt Fluid
02250051-153
304A It Starter
02250120-789
360A It Starter
02250120-792
2-1/2ā Sae Check Valve Insert
02250125-617
240A It Starter
02250122-042
24Kt Fluid
02250051-153
304A It Starter
02250120-789
360A It Starter
02250120-792
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













