MaintainX Asset Hub logo
EnterprisePricing
Siemens

Siemens Low Voltage Power Circuit Breaker WLL2S320

Need answers fast?
Explore the manual using AI.

Siemens Low Voltage Power Circuit Breaker WLL2S320
Siemens Low Voltage Power Circuit Breaker WLL2S320

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Siemens Low Voltage Power Circuit Breaker WLL2S320

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Siemens Low Voltage Power Circuit Breaker WLL2S320

Siemens Low Voltage Power Circuit Breaker WLL2S320

Create an account to install this asset package.

Maintenance Plans for Siemens Low Voltage Power Circuit Breaker Model WLL2S320

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Circuit Breaker Maintenance

Check mark

DANGER: Hazardous voltage. Will cause death, serious personal injury, or equipment/property damage. Turn off and lock out all power supplying this device before working on this device.

Check mark

Only qualified personnel should work on this equipment, after becoming thoroughly familiar with all warnings, safety notices, and maintenance procedures contained herein and on the devices.

Check mark

WARNING: High speed moving parts. Can cause serious personal injury. Discharge the closing spring before inspection and before carrying out any work on the circuit breaker.

Check mark

Is the worker trained and authorized to energize, de-energize, clear, ground and label circuits and equipment in accordance with established safety practices?

Check mark

Is the worker trained in the proper care and use of protective equipment in accordance with established safety practices?

Check mark

Is the worker trained in administering first aid?

Check mark

The WL circuit breaker is designed and constructed to the highest standard of quality, using the best materials available. Design tests and experience have shown that the circuit breakers can withstand and perform greater than the minimum requirements of the associated design and performance standards.

Check mark

Contact assemblies need to be changed depending on their condition, but no later than - 12,500 operations in FS II up to 1600 A; (3- and 4-pole) - 10,000 operations in FS II 3200 A; (3- and 4-pole) - 10,000 operations in FS III; (3- and 4-pole)

Check mark

Number of operations performed by the circuit breaker

Run this procedureArrow right

1 Yearly Function Check

Check mark

Close the cubicle doors

Check mark

Charge closing spring of circuit breakers to be interlocked (page 6-4)

Check mark

Test the various possibilities of the planned interlocking configuration one after the other

Check mark

Re-adjust Bowden cables if necessary

Check mark

Discharge the closing spring of the circuit breakers to be interlocked (page 23-2)

Check mark

Note: The following maintenance points must be followed:

Check mark

1 The adjustment of the Bowden cables needs to be checked after the first 100 switching operations and must be readjusted if necessary.

Check mark

2 The adjustment of the interlocking device needs to be checked and, if necessary, readjusted every 1000 operations or at least once every year.

Check mark

3 During the inspection, the Bowden cables have to be checked against kinks and abrasions, split wires of the exposed steel cable, damage to the cable housing and the adjustment unit (tube setting with thread and nut) and have to be readjusted if necessary. In addition, the movability of movable parts of the interlocking device in their bearings needs to be examined.

Run this procedureArrow right

Arc Chute Check

Check mark

DANGER: Hazardous voltage. Will cause death, serious personal injury, or equipment damage. Turn off and lock out all power supplying this device before working on this device.

Check mark

WARNING: High speed moving parts. Can cause serious personal injury. Discharge the closing spring before inspection and before carrying out any work on the circuit breaker.

Check mark

Circuit breaker opened and closing spring discharged

Check mark

Circuit breaker moved into the withdrawn position in the cradle

Check mark

Arc splitter plates inspected for erosion

Check mark

Arc splitter plates inspected for soot

Check mark

Arc splitter plates inspected for spots of collections of molten metal

Check mark

Is there heavy wear on the arc splitter plates?

Check mark

If there is heavy wear, replace the circuit breaker.

Run this procedureArrow right

Arc Chute Cover Inspection

Check mark

DANGER: Hazardous voltage. Will cause death, serious personal injury, or equipment damage. Turn off and lock out all power supplying this device before working on this device.

Check mark

Arc chute cover present

Check mark

Powder-coated inner sides of the covers not burned

Check mark

No damage on the inner side of the cover

Check mark

Upload a photo of the arc chute cover

Check mark

Sign off on the arc chute cover inspection

Run this procedureArrow right

Arc Chute Removal

Check mark

Warning: Mishandling may lead to broken insulation plates of the arc chute housing, and compromised insulation capacity.

Check mark

Loosen screw by approx. 15 mm; do not remove it; FS III and FS II, class C: remove screw completely

Check mark

Push the cover back; FS III: lift the cover carefully

Check mark

Remove the cover

Check mark

Take out the arc chute

Check mark

Do not stand arc chutes up, when placing them on a table, or any other surface outside of the circuit breaker. The arc chutes should be placed on their side to prevent breakage of the insulation plates.

Check mark

Sign off on the arc chute removal

Run this procedureArrow right

Parts for Siemens Low Voltage Power Circuit Breaker WLL2S320

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Alphanumeric Display For Etu745 - 748

WLLCD48

Analog Output Module

WLANLGCUB

Arc Chute Cover For Cradle (4-Pole) Frame Size Ii

WL4GARC2

Arc Chute Cover For Cradle (4-Pole) Frame Size Iii

WL4GARC3

Arc Chute Cover For Cradle Frame Size Ii

WLGARC2

Alphanumeric Display For Etu745 - 748

WLLCD48

Analog Output Module

WLANLGCUB

Arc Chute Cover For Cradle (4-Pole) Frame Size Ii

WL4GARC2

Arc Chute Cover For Cradle (4-Pole) Frame Size Iii

WL4GARC3

Arc Chute Cover For Cradle Frame Size Ii

WLGARC2

Alphanumeric Display For Etu745 - 748

WLLCD48

Analog Output Module

WLANLGCUB

Arc Chute Cover For Cradle (4-Pole) Frame Size Ii

WL4GARC2

Arc Chute Cover For Cradle (4-Pole) Frame Size Iii

WL4GARC3

Arc Chute Cover For Cradle Frame Size Ii

WLGARC2

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Siemens

Explore Other Assets