Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Siemens Low Voltage Power Circuit Breaker WLL2S320
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Circuit Breaker Maintenance
DANGER: Hazardous voltage. Will cause death, serious personal injury, or equipment/property damage. Turn off and lock out all power supplying this device before working on this device.
Only qualified personnel should work on this equipment, after becoming thoroughly familiar with all warnings, safety notices, and maintenance procedures contained herein and on the devices.
WARNING: High speed moving parts. Can cause serious personal injury. Discharge the closing spring before inspection and before carrying out any work on the circuit breaker.
Is the worker trained and authorized to energize, de-energize, clear, ground and label circuits and equipment in accordance with established safety practices?
Is the worker trained in the proper care and use of protective equipment in accordance with established safety practices?
Is the worker trained in administering first aid?
The WL circuit breaker is designed and constructed to the highest standard of quality, using the best materials available. Design tests and experience have shown that the circuit breakers can withstand and perform greater than the minimum requirements of the associated design and performance standards.
Contact assemblies need to be changed depending on their condition, but no later than - 12,500 operations in FS II up to 1600 A; (3- and 4-pole) - 10,000 operations in FS II 3200 A; (3- and 4-pole) - 10,000 operations in FS III; (3- and 4-pole)
Number of operations performed by the circuit breaker
1 Yearly Function Check
Close the cubicle doors
Charge closing spring of circuit breakers to be interlocked (page 6-4)
Test the various possibilities of the planned interlocking configuration one after the other
Re-adjust Bowden cables if necessary
Discharge the closing spring of the circuit breakers to be interlocked (page 23-2)
Note: The following maintenance points must be followed:
1 The adjustment of the Bowden cables needs to be checked after the first 100 switching operations and must be readjusted if necessary.
2 The adjustment of the interlocking device needs to be checked and, if necessary, readjusted every 1000 operations or at least once every year.
3 During the inspection, the Bowden cables have to be checked against kinks and abrasions, split wires of the exposed steel cable, damage to the cable housing and the adjustment unit (tube setting with thread and nut) and have to be readjusted if necessary. In addition, the movability of movable parts of the interlocking device in their bearings needs to be examined.
Arc Chute Check
DANGER: Hazardous voltage. Will cause death, serious personal injury, or equipment damage. Turn off and lock out all power supplying this device before working on this device.
WARNING: High speed moving parts. Can cause serious personal injury. Discharge the closing spring before inspection and before carrying out any work on the circuit breaker.
Circuit breaker opened and closing spring discharged
Circuit breaker moved into the withdrawn position in the cradle
Arc splitter plates inspected for erosion
Arc splitter plates inspected for soot
Arc splitter plates inspected for spots of collections of molten metal
Is there heavy wear on the arc splitter plates?
If there is heavy wear, replace the circuit breaker.
Arc Chute Cover Inspection
DANGER: Hazardous voltage. Will cause death, serious personal injury, or equipment damage. Turn off and lock out all power supplying this device before working on this device.
Arc chute cover present
Powder-coated inner sides of the covers not burned
No damage on the inner side of the cover
Upload a photo of the arc chute cover
Sign off on the arc chute cover inspection
Arc Chute Removal
Warning: Mishandling may lead to broken insulation plates of the arc chute housing, and compromised insulation capacity.
Loosen screw by approx. 15 mm; do not remove it; FS III and FS II, class C: remove screw completely
Push the cover back; FS III: lift the cover carefully
Remove the cover
Take out the arc chute
Do not stand arc chutes up, when placing them on a table, or any other surface outside of the circuit breaker. The arc chutes should be placed on their side to prevent breakage of the insulation plates.
Sign off on the arc chute removal
Access the parts list for your equipment in MaintainX.
Alphanumeric Display For Etu745 - 748
WLLCD48
Analog Output Module
WLANLGCUB
Arc Chute Cover For Cradle (4-Pole) Frame Size Ii
WL4GARC2
Arc Chute Cover For Cradle (4-Pole) Frame Size Iii
WL4GARC3
Arc Chute Cover For Cradle Frame Size Ii
WLGARC2
Alphanumeric Display For Etu745 - 748
WLLCD48
Analog Output Module
WLANLGCUB
Arc Chute Cover For Cradle (4-Pole) Frame Size Ii
WL4GARC2
Arc Chute Cover For Cradle (4-Pole) Frame Size Iii
WL4GARC3
Arc Chute Cover For Cradle Frame Size Ii
WLGARC2
Alphanumeric Display For Etu745 - 748
WLLCD48
Analog Output Module
WLANLGCUB
Arc Chute Cover For Cradle (4-Pole) Frame Size Ii
WL4GARC2
Arc Chute Cover For Cradle (4-Pole) Frame Size Iii
WL4GARC3
Arc Chute Cover For Cradle Frame Size Ii
WLGARC2
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX