Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Quincy Rotary Screw Belt Drive Air Compressor QSB-50-HP-W
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Sensors Replacement
Removal of Old Sensor
Disconnect conduit from elbow of probe
Cut wires and remove probe from the discharge end of the airend
Installation of New Sensor
Install new probe into discharge tube
Connect wires of new probe to existing wires using suitable splice and insert into conduit
Connect conduit to elbow of probe
Post-Installation Testing
Complete HAT tests
1000 Hourly / 6 Monthly Air Compressor Maintenance
Safety Precautions
Ensure maintenance is performed by trained and qualified technicians only.
Is there any unusual noise or vibration from the compressor?
Wait for the unit to cool before starting service.
Clean up any fluid spills immediately.
Loosen, but do not remove, flange or component bolts to check for residual pressure.
Use safety solvents for cleaning air filters or compressor parts.
Fluid Sample Collection
Preferred sample location
Pressure Transducer Replacement
Preparation
Open enclosure door
Removal of Old Transducer
Locate pressure transducer in the upper left-hand corner of the panel
Remove wire channel cover
Trace wires from transducer to the microprocessor
Disconnect transducer wires at microprocessor
Remove transducer from Teflon bushing
Installation of New Transducer
1 Monthly Belt Tension Check
Preparation
Ensure the Belt Tension Tester (P/N 142645) is available
Rotate pulleys a minimum of 2 revolutions before taking measurements
Belt Tension Measurement
Measure the span length (t)
Position the large o-ring
Apply force and measure deflection force on the upper scale of the tension tester
Is the deflection force within the recommended range?
Adjust belt tension if deflection force is not within the recommended range
Electronic Control Replacement
Preparation
Remove the screws attaching control to door of enclosure
Remove and discard wire tie-wraps
Wiring Identification
Identify individual wire location before removing any wiring from the electronic control
Refer to the electrical wiring diagram
Installation
Install new electronic control panel
Install wiring in accordance with electrical wiring diagram
Access the parts list for your equipment in MaintainX.
Fluid Sample Valve Kit
143286
Belt Tension Tester
142645
Fluid Sample Valve Kit
143286
Belt Tension Tester
142645
Fluid Sample Valve Kit
143286
Belt Tension Tester
142645
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













