

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Navien Water Heater NFB-399C
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Ignition Ground Wiring Check
Check the condition and attachment of the ground wire to the boiler casing
Measure ground continuity using a continuity meter
Is the ground continuity satisfactory?
Replace ground wires if ground continuity is not satisfactory
Piping for Leak Check
Inspection of Piping
Inspect all water and gas piping for leaks
Are all inspected pipes leak free?
Leak Detection and Correction
Look for signs of leaking lines
Describe any problems found with the piping
Correct any problems found
Post Inspection
Is the system free of leaks after corrections?
Water System Check
Verify all system components are correctly installed and operational
Pressure Check
Enter the cold fill pressure for the system
Is the cold fill pressure at least 12 psi?
Enter the system pressure as the boiler heats up
Is the pressure rise within acceptable limits?
Glycol Concentration Test
Does the system contain glycol?
Describe the glycol concentration test results
Boiler Maintenance
Preparation
Place a bucket under the boiler to collect the residual water inside the boiler.
Disconnect the power cord to turn off the boiler.
Valve Management
Close the gas valve.
Close the water supply valve and the return valves on the manifold system.
Draining the Boiler
Remove the drain valve on the manifold system to drain the boiler.
Ensure the pump does not become wet during the draining process.
Ignition / Flame Detector Electrode Inspection
Electrode Removal
Remove the ignition and flame detector electrodes from the boiler heat exchanger
Electrode Cleaning or Replacement
Remove any deposits accumulated on the ignition/flame detector electrode
Were the electrodes cleaned satisfactorily?
Replace with new electrodes if cleaning was unsatisfactory
Electrode Reinstallation
Replace ignition/flame detector electrode
Ensure the following conditions are met for the gasket
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













