Manual for Mitsubishi Air Conditioner PURY-EP400YLM-A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mitsubishi Air Conditioner PURY-EP400YLM-A

Mitsubishi Air Conditioner PURY-EP400YLM-A

Create an account to install this asset package.

Maintenance Plans for Mitsubishi Air Conditioner Model PURY-EP400YLM-A

Integrate maintenance plans directly into your work orders in MaintainX.

BC Controller Control Box Disassembling

Check mark

(1) To check the inside of the control box, remove the two lock nuts on the control box cover.

Check mark

1) Check the terminal connection of the power wire or of the transmission line.

Check mark

2) Check the transformer.

Check mark

3) Check the address switch.

Check mark

(2) When the control board is replaced, the followings must be noted.

Check mark

(1) Check that the board type is G1,GA1(HA1), or GB1(HB1).

Check mark

(2) Check that the wire and the connector are properly connected.

Check mark

Note.

Check mark

It is not required to remove the two fixing screws on the control box when checking the inside.;

Run this procedureArrow right

BC Controller LEV Disassembling

Check mark

Remove the service panel

Check mark

Upload a photo of the removed service panel

Check mark

Replace the LEV in trouble

Check mark

Note: Secure enough service space in the ceiling for welding operation, and conduct the work carefully. If required, dismount the unit from the ceiling, and conduct the work.

Check mark

Sign off on the disassembling process

Run this procedureArrow right

BC Controller Pressure Sensor Disassembling

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Service panel removed

Check mark

For the pressure sensors PS1 and PS3, refer to 1. 1), 2).

Check mark

Pressure sensor connector in trouble removed from the control board and insulated

Check mark

Identify the pressure sensor

Check mark

New pressure sensor attached to the place shown in the figure and connector inserted to the control board

Check mark

Gas leaks from the pressure sensor?

Check mark

If gas leaks from the pressure sensor, repair the leak, and follow the instructions above if required.

Check mark

Sign off on the BC Controller Pressure Sensor Disassembling

Run this procedureArrow right

BC Controller Service Panel Disassembling

Check mark

Remove the two lock nuts on the control box

Check mark

Loosen the other two nuts on the control box

Check mark

Remove the control box

Check mark

Remove the three fixing screws on the service panel

Check mark

Remove the service panel

Check mark

Remove the nine machine screws on the ceiling panel

Check mark

Remove the ceiling panel

Run this procedureArrow right

BC Controller Solenoid Valve Disassembling

Check mark

Remove the service panel

Check mark

Remove the connector of the solenoid valve in trouble

Check mark

Remove the solenoid valve coil

Check mark

The coils on the solenoid valves SVA, SVB, SVM1,SVM1b, SVM2, and SVM2b can be serviced through the inspection door.

Check mark

SVC is accessible for replacement by removing the four mounting screws on the rear panel and removing the panel

Check mark

SVM1 is present only on the G1, GA1, and HA1 types, SVM2 on the GA1 and HA1 types, and SVM1b and SVM2b on the HA1 type.

Check mark

Sign off on the disassembling process

Run this procedureArrow right

Parts for Mitsubishi Air Conditioner PURY-EP400YLM-A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

BC Controller

CMB-P104V-GA1

Check Valve - CV4a

P639180X01

Check Valve - CV6a

P633133X01

Check Valve - CV8a

P633135X01

Check Valve Replacement Instructions - CV4a

WT07373X01

BC Controller

CMB-P104V-GA1

Check Valve - CV4a

P639180X01

Check Valve - CV6a

P633133X01

Check Valve - CV8a

P633135X01

Check Valve Replacement Instructions - CV4a

WT07373X01

BC Controller

CMB-P104V-GA1

Check Valve - CV4a

P639180X01

Check Valve - CV6a

P633133X01

Check Valve - CV8a

P633135X01

Check Valve Replacement Instructions - CV4a

WT07373X01

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mitsubishi

Explore Other Assets