

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Ceiling Cassette Indoor Unit SLZ-KA50VA
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Drainage Check
9.3. Check drainage
9.3.1. For wireless remote controller (Fig. 9-3)
• During the test run, ensure the water is being properly drained out and that no water is leaking from joints.
• Always check this during installation even if the unit is not required to provide cooling/drying at that time.
• Similarly, check the drainage before finishing ceiling installation in a new premises.
(1) Remove the cover of the water supply inlet and add about 1000 cc of water using a water supply pump etc. During this process, be careful not to spray water into the drain pump mechanism.
(2) Switching on emergency operation switch (cooling) on the grille.
(3) Confirm that water is being drained out through the drainage outlet.
(4) After checking the drainage, ensure that the cover is replaced and the power supply is isolated.
Air Conditioner Test
Before test run
Check that the unit is free from leaks of refrigerant, loosened connections, and incorrect polarity.
Measure an impedance between the power supply terminal block (L, N, ) on the units and the ground with a 500 V Megger
Test run
For wireless remote controller
Measure an impedance between the power supply terminal block on the outdoor unit and the ground with a 500 V Megger
Check for any wrong wiring
Check that the vanes operate properly when cool air is blown out.
Check that warm air blows out.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













