Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mercer Valve Pressure Relief Valve 91-12F41BA7B5
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Pressure Relief Valve Leak Inspection
Warning: This inspection requires trained personnel with PPE!
Set pressure of the valve verified?
Enter the set pressure of the valve
Enter the leak test pressure
Contact Mercer Valve Co., Inc. for proper leak pressure and specification for the valve
Pressure held steady during the test?
Any leakage observed during the test?
Select the method used for testing leakage
Zero bubbles observed for one minute in API 527 test?
1 Yearly Pressure Relief Valve Set Pressure Inspection
Warning: This inspection requires trained personnel with PPE!
The set pressure inspection is performed in accordance with the ASME BPVC.
The set pressure tolerance is calculated based on the actual nameplate set pressure.
The set pressure test should be performed before and after any repairs.
The set pressure is inspected to the definition listed in NB-18.
The correct fluid for testing has to be used to achieve accurate results.
Setting procedures should be in accordance with ASME PTC 25.
The rate of the system pressure increase should be slow when the pressure is within 15% of the set pressure.
The procedures for testing set pressure are as follows.
Pressure Relief Valve Testing With Mobile Test Units
Warning: Only trained personnel should perform this procedure
Valve removed from the application
Thorough inspection of the valve performed
Is transporting the valve necessary?
Select the type of mobile test unit used
Document the limitations of the test stand
Enter the size of the valve
Enter the pressure the test stand is designed for
Did the valve pass the test?
Pressure Relief Valve Component Inspection
Inspect new parts
Seat inspected for cuts and abrasions
Seat polished and restored if minor scratches or abrasions are present
Seat replaced if deep abrasions and cuts are present
Diameter, Ds, of the nozzle measured
Disk subassembly inspected
Spherical surface portion that engages the seat is clean and smooth
Disk replaced if the spherical surface is damaged or scratched
Diameter, Da, measured
1 Yearly Pressure Relief Valve Maintenance
For dependable performance, PRVs must be maintained regularly.
Mercer Valve Co., Inc. recommends its PRVs are inspected and tested annually.; After the valve has been in installed and a service history has been established, the testing and inspection frequency may be adjusted.
Some guidelines for testing frequencies are found in NB-23, API 576, and API 598.; Additionally, government jurisdiction should be reviewed.; When maintenance is done, qualified repair personnel should perform it.; Qualified repair personnel conducting the annual inspection and testing may alter the maintenance schedule based on the service conditions.
During the inspection, a visual inspection, a set pressure verification, and a leak check should be completed.; These tests can be performed while the PRV is installed on its system or when it’s on a testing bench.; The PRV can only be tested while on its application if there is a method and procedure to apply a controlled pressure to the PRV’s inlet without exceeding any limits of the system.
A visual inspection is used to identify if the PRV is installed properly, is correct for the application, and doesn’t have apparent problems.
Check the nameplate information to verify that the valve is installed on the proper service. A missing nameplate requires immediate addressing.
If the valve is installed on gas/vapor service, the nameplate’s capacity will indicate an air capacity at standard conditions.
If the valve is on liquid service, the nameplate will indicate a water capacity.
Check the seal wire. A broken seal wire indicates that an unqualified person has adjusted the set pressure this also removes any warranty the valve had.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX