

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

LG Air Conditioner LMN123HV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Air Conditioner Leak Check
Preparation
Check that all tubes and wiring are properly connected
Remove the service valve caps from both the gas and liquid sides on the outdoor unit
Are both the liquid and gas side service valves on the outdoor unit closed?
Leakage Test
Connect the manifold valve and dry nitrogen gas cylinder to the service port with charge hoses
Is the high side manifold valve kept closed?
Enter the pressure reading after pressurizing the system with dry nitrogen gas
Is the pressure reading 550 P.S.I.G.?
Air Conditioner Drainage Check
Air Filter Removal
Remove the Air Filter
Drainage Inspection
Spray one or two glasses of water upon the evaporator
Ensure that water flows through the drain hose of indoor unit without any leakage
Triple Leak/Pressure Check
Initial Setup
Open isolation ball valves, if installed in the piping system.
Verify service ports and caps
Outdoor Unit Preparation
Remove caps on both liquid and gas (vapor) suction Schrader ports.
Connect nitrogen cylinder regulator to gauge manifold and Schrader ports.
Leak/Pressure Check
Perform leak/pressure check at 150 psig for 15 minutes.
Perform leak/pressure check at 300 psig for 30 minutes.
Wiring Error Check
Setting Procedure
Shut down the power source
Set the Dip Switch as instructed
Reset the power
LED Indicator Check
Check that the LEDs on the PCB are on during operation
Is the Green LED lit up indicating correct wiring?
Error Display Interpretation
Record the Red LED blink count for piping number
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













